My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-Tracy GMS BoundaAndition Verification Work Plan <br /> allows concurrent evaluation of different types <br /> of data including hydrogeologic, geologic, <br /> chemical, geophysical, and institutional data. <br /> 4.2 Reporting Reguirements <br /> 4.2.1 Technical Reports <br /> An engineering technical memorandum will be <br /> prepared summarizing the results of the <br /> investigation. The report will include test results <br /> and conclusions,CPT northings and eastings, <br /> surface elevations, and groundwater elevations. <br /> 4.2.2 Field Data Reporting <br /> 4.2.2.1 Field data reporting includes project <br /> reporting in electronic and hard copy deliver- <br /> ables. Field data hard copy deliverables include <br /> field data sheets(e.g. CPT print outs, boring <br /> logs). The electronic project data, including <br /> available CPT data and survey,will be data files <br /> that conform to the latest format specified in the <br /> EDMS Data Exchange Protocol(Radian, 1997). <br /> The files will be delivered as ASCII text files <br /> that will be imported into the EDMS. <br /> 4.2.2.2 Daily field logs will be provided to <br /> CEHNC and DDJC-Tracy staff on the same day <br /> as the field work occurred. The field logs will <br /> note work accomplished, data collected, <br /> problems encountered and actions taken,and the <br /> work planned for the following day. <br /> 6.0 PROJECT SHEDULE <br /> Table 5-1 is an estimated schedule for project <br /> tasks. <br /> 6.0 REFERENCES <br /> Radian International, 1997.EDMS Data <br /> Exchange Protocol.Radian <br /> International, 1998.DDJC-Tracy/Tracy <br /> Comprehensive Field Work Plarr/QAPP. <br /> Final. Version 2.0.April. <br /> t-gms-wp 8 30 April 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.