My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f • • <br /> EPA Comments <br /> 1999 Well Monitoring Program Field Work Plan <br /> DDJC-Tracy, March 1999, Final <br /> 1. Response to EPA Comment No. 1 (January 7, 1999) : Section 3.0, Summary <br /> of Work to be Performed, Natural Attenuation Sampling. <br /> The response to this comment states " (A) Specifics of <br /> natural attenuation monitoring based on AFCEE and U.S. EPA protocols will be <br /> included in the next work plan version. " However, this is not the case, <br /> since in Section 3.0, the third bullet states, "The work plan that will <br /> provide specific details regarding natural attenuation sampling will be <br /> addressed in a separate technical memorandum. " Please indicate when this <br /> technical memorandum will be available for EPA review. <br /> 2. Response to EPA Comment No. 2 (January 7, 1999) : Appendix B, Table B-2 <br /> The response to the last bullet of this EPA comment states <br /> " (A) The eight EWs mentioned are part of the D030 RD/RA Work Plan and should <br /> be included in the Final Table B-2 of the Annual. " EPA assumes that the <br /> final Table B-2 has been included in this final work plan. However, only <br /> four new extraction wells (not eight, per the response) were found in Table <br /> B-2: EW040EW through EW044AU. Please identify the name, location, and <br /> status of each of these eight extraction wells, and include them in Table <br /> B-2. <br /> 3. Figure 3-2A, Well Locations, North End DDJC-Tracy and Annex <br /> Table B-2 has been revised to include planned extraction <br /> wells EW040EW through EW044AU. Please revise Figure 3-2A to show the <br /> locations of these planned wells. <br /> 4. Response to EPA Comment No. 3 (January 7, 1999) : Section 3.1.1, Sample <br /> Numbers and Appendix A, Analytical Matrix Tables <br /> This concern has not been addressed despite the response to <br /> this comment. The 1Q99 Sampling and Analysis Matrix in Appendix identifies <br /> 108 wells to be sampled, yet Section 3.1.1 identifies 196 wells are to be <br /> sampled in 1Q99. Please resolve this discrepancy. <br /> 5. Response to EPA Comment No. 4 (January 7, 1999): Table B-2, Well <br /> LM025AUA <br /> This concern has not been addressed despite the response to <br /> this comment. Well LM025AUA in Table B-2 still shows annual sampling <br /> instead of semi-annual sampling. <br /> 6. Response to EPA Comment No. 5 (January 7, 1999) : Table B-2, Wells <br /> LM58AU, LM066A, and LM093AU <br /> This concern has not been addressed despite the response to <br /> this comment. Applicable text in Table B-2 has not been revised. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.