TIMETABLES AND DEADLINES <br /> DDRW SHARPE <br /> (REVISED APRIL 7, 1993) <br /> OPERABLE UNIT I REMEDIAL DESIGN SCHEDULE <br /> Estimated <br /> moat Spates <br /> Draft Remedial Design Documents* 5 Mar 93 <br /> 5 Mar 93 <br /> (Includes 30% Design, Remedial <br /> Action Work Pian, Site-Specific <br /> Health/Safety Plan, Field Sampling <br /> Plan, service Contract Document, <br /> Construction Quality Assurance <br /> Plan, Operation and Maintenance <br /> Plan, Field Sampling Plan, & <br /> Personnel Training Plan) <br /> None 4 May 93 <br /> 30% RD Meeting* <br /> Per Consultation 8 Jul 93 <br /> Draft Final Remedial Design Section <br /> Documents* 8 Jul 93 <br /> None <br /> 60% RD Meeting <br /> None 9 Sep 93 <br /> 95$ RD Meeting ' <br /> Final Remedial Design Documents* Per Consultation 7 Oct 931 <br /> Section <br /> Continuous Onsite Remedial 15 Months after 25 Apr 94 <br /> Activity ROD <br /> • Primary Document(subject to Dispute Resolution Procedures) <br /> 1 Project Managers have agreed to allow additional comment period <br /> al RD package before RD is finalized. <br /> by regulators on Draft Fin <br /> 2 <br />