Laserfiche WebLink
IRM Rehabilitation • -3- 29 March 1993 <br /> DDRW, Tracy <br /> be evaluated? Which longterm measures will be proposed to reduce bio-fouling? <br /> This letter Work Plan may be prepared prior to preparation of the chemical <br /> benchtest and chemical treatment Work Plans. <br /> If you have any questions, please call me at (916)255-3065. <br /> MES TAYLO <br /> Engineering Geologist <br /> JDT:jt <br /> cc: Mr. Marshall Cloud, Defence Distribution Region West, Tracy, Tracy <br /> Mr. Steve Light, U. S. Army Corps of Engineers, Huntsville, Alabama <br /> Mr. Michael Work, U. S. Environmental Protection Agency, Region IX, San <br /> Francisco <br /> Mr. Jim Pinasco, Department of Toxic Substances Control , Region 1, <br /> Sacramento <br /> Ms. Dianne Hinson, Public Health Services of San Joaquin County, <br /> Environmental Health Department, Stockton <br />