Laserfiche WebLink
2 . Section 5. 0. 1. 1, Page 5-1 <br /> The document does not present the results of an evaluation <br /> to determine the adequacy of the previous abandonment of <br /> Well 3 , as per the Work Plan. Please provide a brief <br /> discussion of the evaluation, if performed. <br /> 3. Table 5-1 <br /> It appears that the first column of soil analytical results <br /> from Well 1 should be labelled as 1120 ft, " not as 11580-620 <br /> ft. " <br /> There is a footnote labelled as " (b) " in the table, but it <br /> does not refer to a specific depth interval . Was not the <br /> sample of woody/tarry material taken from the depth interval <br /> of 580 to 620 feet as discussed in Section 3 . 2 . 1. 1. 12? <br /> Please clarify these issues. <br /> 4 . Table 5-3 <br /> According to this table and Table 3-1, the waste cuttings <br /> from Well 1 (Drill Cuttings A and B) had the following <br /> analyses performed on them: <br /> TPH, Toxicity Characteristic Leaching Procedure (TCLP) <br /> 8080, TCLP 8150, TCLP 8240, TCLP 8270, TCLP Metals, <br /> Waste Extraction Test (WET) Metals, pH, Total Dissolved <br /> Solids (TDS) , Conductivity <br /> According to the laboratory cover letter and listed <br /> preparation and analysis dates, no such analyses were <br /> performed for these samples. However, the laboratory <br /> Summary, positive results from the analyses of the two <br /> referenced samples including diesel , arsenic, barium, <br /> chromium, cobalt, lead, nickel , vanadium, zinc, <br /> conductivity, and TDS . The chains-of-custody sheets show <br /> that all the analyses were ordered. Laboratory Quantitative <br /> data sheets were included in Appendix D for only the TDS, <br /> Conductivity and pH for these two samples. The Quality <br /> Assurance data sheets were included for only the sample <br /> designated as "Drill Cuttings B. " Please provide a complete <br /> set of laboratory data sheets and provide a discussion of <br /> the findings for diesel in these samples. <br /> 5. Appendix D, Section D.2 . 4. 2 . 1 Page D-3 <br /> According to the laboratory data sheets, the holding times <br /> for TDS was exceeded in the analysis of a waste cuttings <br /> sample from Well 1 (Drill Cutting B) . Please include a <br /> statement concerning this in the text. <br /> 3 <br />