Laserfiche WebLink
r <br /> Warehouse Excavation Plan -3- 23 August 1991 <br /> DDRW, Tracy <br /> Although not specific to the Plan, the construction of the warehouse represents a type <br /> of remedial measure, in that the potentially contaminated subsoils will be capped. <br /> Construction of the warehouse can be considered a positive measure in contrast to the <br /> uncapped buried wastes which have had infiltration from rainfall and agricultural <br /> irrigation in the 40 to 50 years that these wastes are known to have been buried. <br /> CKW:cw <br />