My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -6- <br /> DEFENSE DISTRIBUTION REGION WEST TRACY <br /> SAN JOAQUIN COUNTY <br /> ( iv) All equipment, instrumentation, and alarm/notification systems <br /> shall be inspected throughout the duration of the "Prove-out" , <br /> and certified operational . <br /> (v) The Discharger shall operate the extraction wells to produce the <br /> most effective hydraulic barrier to off-Depot contaminant <br /> migration. <br /> (vi) The Discharger shall evaluate the ability of the air stripper <br /> system to meet nondetectable limits (per EPA Method 8010) for <br /> TCE and PCE (0. 12 and 0.03, respectively). <br /> (vii ) The operation of the interim ground water cleanup system shall <br /> cease at the end of the 96-hour Prove-out period. The <br /> Discharger shall not resume operation of this system until the <br /> Board has reviewed the "Prove-out of System Report" (Provision <br /> D.4) and authorizes operation in writing. <br /> 4. FULL SCALE OPERATIONS: <br /> The Discharger shall not initiate the full scale operation of the <br /> interim ground water cleanup system until the Board and the Department <br /> of Health Services have reviewed the "Prove-out of System Report" <br /> (Provision D.4. ) , and have both approved the full scale operation of <br /> the system. The following requirements apply to this "Full Scale <br /> Operations" phase. <br /> ( i ) All extracted ground water shall be treated by the air stripper <br /> facility and discharged to the storm drain holding pond and/or <br /> to the injection well field. <br /> (ii ) The discharge of treated ground water to the three injection <br /> wells shall not exceed the steady state reinjection capacity of <br /> the wells as determined during the "Potable Water Start-up" <br /> phase (Discharge Specification C.1. ) . <br /> ( iii) Discharges of treated ground water to the storm drain holding <br /> pond shall be prohibited between 1 November and 30 April , unless <br /> the Discharger submits documentation to the Board that <br /> demonstrates that a discharge is necessary to maintain the <br /> ecological systems present in the pond, and that the discharge <br /> would not significantly reduce the storm water retention <br /> capacity of the pond. <br /> (iv) The Discharger shall operate the extraction wells to produce the <br /> most effective hydraulic barrier to off-Depot contaminant <br /> migration. <br /> (v) The Discharger shall operate the air stripper to maximal VOC <br /> removal efficiencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.