My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -5- <br /> DEFENSE DEPOT TRACY <br /> SAN JOAQUIN COUNTY <br /> (2) = The Daily Maximum" values are protective of drinking water uses, and <br /> consists of the most stringent federal and state MCLS, proposed MCLS, or <br /> state Action Levels. <br /> C. Discharge Specifications: <br /> 1. POTABLE WATER STARTUP: <br /> Prior to operating the ground water cleanup system with contaminated <br /> water, potable water shall be circulated through the air stripper <br /> facility and the disposal system to confirm that the hydraulics of <br /> these systems are adequate. The following requirements apply to this <br /> "Potable Water Startup Phase" : <br /> (i) The potable water startup test shall last a minimum of eight (8) <br /> hours. <br /> (ii) The flow rate shall be at a minimum of 100 gpm, and shall be <br /> increased to 500 gpm for at least two (2) continuous hours. <br /> (iii) The steady state reinjection capacity of the three injection <br /> wells shall be determined. The injection field shall be <br /> monitored per the "8-Hour Potable Water Startup Phase <br /> Monitoring" plan in the attached Monitoring and Reporting <br /> Program No. 90- <br /> ( iv) All treatment, transport, and disposal components (including <br /> pumps, valves, liquid level controllers, pipelines, blowers, <br /> flow meters, pressure gauges, etc. ) shall be inspected for leaks <br /> and/or malfunctions. In addition, the � 'stem' s automatic <br /> controls, including the alarm/notification ani. shutdown systems, <br /> must be inspected and certified operational . <br /> (v) All leaks and/or malfunctions observed during the potable water <br /> test shall be corrected. <br /> (vi) The potable water startup test shall not be construed as <br /> completed until the system has operated without leaks and/or <br /> malfunctions for a period of eight (8) consecutive hours. <br /> 2. CONTAMINATED WATER STARTUP: <br /> The Discharger shall not operate the air stripper facility with <br /> contaminated water from the extraction wells until t. e "Potable Water <br /> Startup" phase has been successfully completed per Discharge <br /> Specification C.1 . (above). The following requirements apply to this <br /> "Contaminated Water Startup" phase: <br /> (i) All extracted ground water shall be treated by the air stripper <br /> facility and discharged to the storm drain holding pond only. <br /> Discharge to the injection wells is prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.