Laserfiche WebLink
�g 28 01 03: 08p DDJC-FA 209 839 4949 p. 3 <br /> requirement fora SWMU 4 design is redundant. The RAR report is proposed to be kept in the <br /> FFA schedule as a means of documenting in the near term the effectiveness of the selected <br /> remedy. <br /> These changes are included in the enclosed revised FFA Schedule matrix and are summarized <br /> below. <br /> Item#14 Document Title Draft Submission Comments Due Date <br /> From: Draft Design, Construction 16 August 01 15 October 01 <br /> QA/QC Plan,Remedial <br /> Action Work Plan(SWMU 4) <br /> To: Draft Design, Construction Delete from Delete from <br /> QA/QC Plan, Remedial schedule schedule <br /> Action Work Plan(SWMU 4) <br /> Draft Final <br /> Item#17 Document Title Submission Comments Due Date <br /> From: Remedial Action Report, 14 August 2001 13 Sep 01 <br /> Small Excavations and Wet <br /> Season Controls <br /> To: Remedial Action Report, 20 September 2001 22 October 2001 <br /> Small Excavations and Wet <br /> Season Controls <br /> Draft Final <br /> Item#24 Document Title Submission Comments Due Date <br /> From: Amendment to the Record of 27 August 01 26 Oct 01 <br /> Decision (ROD) <br /> To: Amendment to the Record of 25 September O1 21 Jan 02 <br /> Decision(ROD) <br /> Additionally, erroneous references to public review periods in the comment sections for Items <br /> 921 and #21a(ESD to the ROD)have been removed from the revised FFA schedule. <br /> If you have any questions, please contact Mr. Dale Clemens,Environmental Protection <br /> Specialist, at (209) 8394067. <br /> Sincerely, <br /> JOHN J. GUZ� <br /> Environmental Program <br /> Manager <br /> Enclosure <br /> 08/28/01 TUE 15:06 [TX/RX NO 72081 <br />