Laserfiche WebLink
STATE OF CALIFORNIA - Environmental Prote tion Agency PETE WILSON, Governor <br /> CALIFORNIA REGIONAL WATER Q0VTY CONTROL BOARD , <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916) 255-3000 <br /> DOD FAX: (916) 255-3052 <br /> 12 August 1994 <br /> Mr. Jim Pinasco <br /> Department of Toxic Substances Control <br /> 10151 Croyden Way, Suite 3 <br /> Sacramento, CA 95827-2106 <br /> DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION/FEASIBILITY STUDY - PHASE II <br /> WORK PLAN, DEFENSE DISTRIBUTION REGION WEST (DDRW), TRACY, SAN JOAQUIN <br /> COUNTY <br /> We have reviewed the Draft Comprehensive Remedial Investigation/Feasibility Study (RI/FS) - <br /> Phase II Work Plan (Draft Phase II Work Plan) for DDRW, Tracy submitted 13 June 1994. Most <br /> of our concerns with the Draft Phase II Work Plan were resolved during the Project Manager's <br /> Meeting held on 19 July 1994 to discuss Phase II field activities, and the followup teleconferences of <br /> 27 and 28 July 1994 held to discuss the need for further investigation of specific solid waste <br /> management units (SWMUs). We appreciate receiving a copy of the draft correspondence, letter to <br /> Mr. Steve Light of the Army Corps of Engineers from Ms. Jamie Atwood of Montgomery Watson, <br /> dated 25 July 1994. This letter is a complilation of the general and site-specific modifications to be <br /> made to the Draft Phase II Work Plan as agreed upon by all parties attending the 19 July 1994 <br /> meeting. We have also received copies of the letters from Ms. Atwood to Mr. Light, dated 27 and <br /> 28 July 1994, which summarize the action items tentatively agreed upon during the teleconferences <br /> held on those dates. <br /> The Draft Phase II Work Plan is acceptable once modified in accordance with the general and site- <br /> specific items presented in the foregoing mentioned letters. In addition, we have the following <br /> remaining comments which must be addressed in the revised version of the Draft Phase II Work <br /> Plan. <br /> GENERAL COMMENTS <br /> Waste Extraction Test Procedure Using Deionized Water (DI-WET): It is our <br /> understanding that the site-specific DI-WET analyses specified in Ms. Atwood's 25 and 28 <br /> July 1994 letters to Mr. Light, are to be conducted in addition to the DI-WET analyses <br /> proposed in the Draft Phase II Work Plan. <br /> Each DI-WET analysis should be conducted on the sample with the highest concentration of <br /> the constituent of concern, based on the analytical data obtained from all soil samples <br /> collected from a site prior to implementing the DI-WET procedure. At sites where the <br /> required analytes include Polychlorinated Biphenyls (PCBs), pesticides, and metals, the <br />