Laserfiche WebLink
J <br /> Geotechnical Engineering Services BSK Proposal No. 04-20-0117 <br /> Proposed Soil Management Cell February 12, 1996 <br /> Tracy Army Depot Page 3 <br /> DDRW-Tracy, California <br /> include in-situ moisture and density, consolidation-expansion, strength, gradation analyses, and <br /> classification tests. Physical tests would be performed in accordance with the current ASTM Test <br /> Methods. No chemical testing for environmental assessment purposes would be conducted for <br /> this investigation. <br /> 2.3 Engineering and Report <br /> Based on the results of our proposed field work and laboratory testing, we would perform <br /> engineering analyses to evaluate soil parameters at the subject site and provide design <br /> recommendations for site preparation procedures and foundation for the proposed cell. The <br /> results of these analyses would be the basis for our conclusions and recommendations. These <br /> would be summarized in a report containing the following: <br /> ► Site Plan with boring locations; <br /> ► Detailed logs of test borings; <br /> ► Results of laboratory tests; <br /> ► Site location and description; <br /> ► Surface and subsurface soil and groundwater conditions, if encountered; <br /> ► Site preparation procedures including excavation, grading, and cell foundation backfill <br /> requirements; <br /> ► Import fill specification, if required; <br /> ► Allowable bearing pressures and seismic design consideration; <br /> ► Estimated settlements; <br /> ► Embankment stability; <br /> ► Lateral earth pressures and frictional coefficient; <br /> ► Recommendatior trench excavation and backfilling; <br /> ► Recommendation�lbr construction observations and testi <br />