My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DDJC-Tracy EW005 Abandonment Work Plan <br /> 1.3.2 Additional information on the well,the and comparison with extraction well <br /> pump, and its components were gathered to construction diagram details, the well will be <br /> determine the best possible approach to abandon abandoned using pressure-grouting techniques. <br /> the well. In Section 2.0 of this work plan, the Well abandonment by pressure grouting will <br /> approach to abandoning EW005AU is discussed include the following: <br /> in detail. Also,removal of the pump and <br /> components still present in the well is included • Coordination with SJCEHD to obtain well <br /> in the abandonment procedures. destruction permit approval, and notification <br /> by SCJEHD of the abandonment schedule; <br /> 2.0 PLANNED FIELD WORK <br /> SUMMARY • Pressure grouting the well from the bottom <br /> of the well to the ground surface using a <br /> 2.1 Pump and Sediment Removal tremiepipe; the well sealant material will <br /> consist of a cement/bentonite grout mixture <br /> 2.1.1 Prior to initiation of any EW005AU in accordance with California Well <br /> abandonment activities, an attempt will be made Standards -Bulletin 74-90(California <br /> to remove the pump and its components from Department of Water Resources, 1991); and <br /> the extraction well. The pump removal activities <br /> will include the following: • Removal of surface protective casing to a <br /> depth of 5 feet bgs and restoration to <br /> • Review of well construction and pump surrounding conditions. <br /> records; <br /> 2.2.2 Field activities will be performed using <br /> • Coordination with San Joaquin County procedures described in the Comprehensive <br /> Environmental Health Division (SJCEHD) Field Work Plan.Examples of activities include <br /> on date of attempted pump removal; (with Comprehensive Field Work Plan section <br /> numbers): <br /> • Attempts to remove pump by pulling drop <br /> pipe and wiring from the well with various • Regulatory Issues and Permits (8.1); <br /> downhole retrieval tools, as needed; and <br /> • Initial Abandonment Activities, Grout <br /> • If pump is removed, sounding the extraction Composition/Placement(8.3/8.4/8.5); and <br /> well to verify there are no other obstructions <br /> above the bottom of the casing. • Decontamination(9.3). <br /> 2.1.2 If more than 5 feet of silt remains in the 2.3 Well Abandonment by <br /> bottom of the well after pump removal, the well Overdri Iling <br /> will be surged and bailed in an attempt to <br /> remove sediments in the well. If surging the well 2.3.1 If EW005AU pump removal efforts are <br /> to remove sediment is unsuccessful, the well unsuccessful, or the well screen is damaged, the <br /> will then be abandoned by overdrilling the entire well will be abandoned by overdrilling in <br /> well casing,as described in Section 2.3. compliance with requirements established by the <br /> California Well Standards -Bulletin 74-90 and <br /> 2.2 Well Abandonment by abandonment procedures described in the <br /> Pressure Grouting Comprehensive Field Work Plan. <br /> 2.2.1 If the pump removal effort is successful, 2.3.2 Well abandonment activities by <br /> and the total depth of the extraction well is overdrilling will include the following: <br /> verified through sounding of the well bottom <br /> ABNDNMNT.DOC 3 February 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.