Laserfiche WebLink
• DDJOracy OU 1 Pesticide Remediation <br /> Groundwater Piezometer Abandonment and Installation Work Plan <br /> 1.0 INTRODUCTION AND abandoned.Permanent piezometers are needed <br /> BACKGROUND to provide water level data points crossgradient <br /> from the extraction wells.When installed,the <br /> 1.1 This work plan describes the proposed temporary piezometers were not completed as <br /> groundwater piezometer abandonment and permanent monitoring points;i.e.,the well <br /> installation effort to be conducted at the Defense construction included only filter pack and a <br /> Distribution Depot San Joaquin California Tracy bentonite seal placement;no grout was installed. <br /> Site(DDJC-Tracy).Extraction wells(EWs) Therefore,all 10 of the piezometers will be <br /> EW047AU and EW048AU and 10 temporary abandoned,and the piezometers determined to <br /> piezometers(TPZs),TPZI through TPZ10,were become permanent are planned to be reinstalled <br /> installed in 2002,and aquifer testing was near their original temporary locations. <br /> performed to provide more effective capture of <br /> the leading edge of the pesticide(dieldrin) 2.0 TEMPORARY PIEZOMETER <br /> plume that has migrated beneath agricultural ABANDONMENT <br /> land of the DDJC-Tracy Annex(see Figure 1-1). <br /> This effort was completed as part of DDJC's 2.1 Based on the aquifer test results,the <br /> ongoing Operable Unit(OU) I groundwater temporary observation piezometers were <br /> remediation efforts. recommended to be either abandoned or <br /> converted to permanent piezometers.Four of the <br /> 1.2 To determine if the operation of EW047AU 10 piezometers were recommended to be <br /> and EW048AU combined with EW040AU and abandoned:TPZ3,TPZ5,TPZ6, and TPZ8 <br /> EW041AU could adequately capture the leading (URS,2004b).Abandonment will be performed <br /> edge of the dieldrin plume,aquifer testing was according to the general procedures described in <br /> performed on the new wells. During the aquifer the DDJC-Sharpe/Tracy Comprehensive Field <br /> testing,water level measurements were collected Work Plan Field Procedures(URS,2004c).All <br /> from the 10 temporary piezometers. Seven abandonment procedures will be performed in <br /> temporary piezometers were installed in the accordance with federal, state, and county <br /> Above Upper Horizon,and 3 were installed in regulations to assure that the quality of the <br /> the Upper Horizon.Drawdown measured in the groundwater is protected and possible physical <br /> piezometers provided an estimate of capture hazards to humans is eliminated. <br /> zone width. The results from the aquifer testing <br /> were documented in the DDJC-Tracy Operable 2.2 As the casing is pulled out of the ground, <br /> Unit I Pesticide Remediation Aquifer Test grout will be injected to fill the boring. In the <br /> Results for EW047AU and EW048AU(URS, event that the casing breaks or the soil collapses <br /> 2003), around the casing,preventing it from being <br /> pulled out,the boring will be drilled out using <br /> 1.3 After an evaluation of the lithology from hollow-stem auger techniques and backfilled <br /> the extraction well borings and the aquifer test with grout. <br /> results,a memorandum was prepared(and later <br /> revised to address CESPK review comments on 2.3 Cement grout will consist of Type II <br /> the original memorandum) to make recom- Portland cement with 3 pounds of powdered <br /> mendations for those piezometers that were to non-beneficiated bentonite and 7 gallons of <br /> become permanent and those that should be water per 94-pound sack of cement.The cement <br /> abandoned(URS,2004a; URS,2004b). As grout will be mechanically mixed with a paddle- <br /> described in the DDJC-Tracy Operable Unit I type mixer and then tremied in place.No <br /> Pesticide Remediation Groundwater Extraction accelerator will be added to the grout. <br /> Well Installation Work Plan(URS,2002), some <br /> of the temporary piezometers were to be 2.4 For the piezometers recommended to be <br /> converted to permanent piezometers,and the made permanent,a new boring will be drilled <br /> remaining temporary piezometers were to be <br /> K:\Wpr Ms\00701\Tracy\0UI Pst PZ Abnd\DRAFNext.dM I Jme 2004 <br />