Laserfiche WebLink
• DDJOTacy OU 1 Pesticide Remediation <br /> Groundwater Piezometer Abandonment and Installation Work Plan <br /> approximately 10 feet from the original location, • Reference elevation for all depth measure- <br /> and a new piezometer constructed. ments; <br /> 3.0 PIEZOMETER INSTALLATION • Name of driller; <br /> ACTIVITIES <br /> • Name and signature of the field geologist <br /> 3.1 Six of the 10 temporary piezometers were preparing the log;and <br /> recommended to be reinstalled as permanent <br /> piezometers,TPZI,TPZ2,TPZ4,TPZ7,TPZ9, • Name and signature of California registered <br /> and TPZ10(URS, 2004b).Upon reinstallation, geologist who provided oversight. <br /> each permanent piezometer will be assigned a <br /> new piezometer number. 3.4 The field geologist will record an as-built <br /> diagram of each piezometer during the con- <br /> 3.2 A hollow-stem auger drill rig will be used struction.The type of information that will be <br /> to construct 1-inch-inside-diameter piezometers included in the log is discussed in the DDJC- <br /> with the materials described in the following SharpelTracy Comprehensive Field Work Plan <br /> paragraphs. Screen intervals of the piezometers Field Procedures(URS,2004c). <br /> will be determined using lithologic data obtained <br /> from continuous coring of EW047AU and 4.0 PIEZOMETER MATERIALS <br /> EW048AU,which were drilled to approximately <br /> 60 feet below ground surface(bgs). 4.1 Piezometer Casing <br /> 3.3 The URS field geologist will maintain an The piezometer casing will be 1-inch-inside- <br /> accurate log for each boring drilled.At a diameter Schedule 40 polyvinyl chloride(PVC) <br /> minimum,the log shall include: pipe with flush threads.The casing surface will <br /> be free of solvents, oils,grease,paint,and dirt <br /> • Name of the project and site; and will be certified clean from the factory or <br /> steam-cleaned on site prior to installation. <br /> • Boring number; Sections of casing will be received from the <br /> supplier wrapped in polyethylene protective <br /> • Date drilled; wrappers with sealed ends to limit exposure to <br /> potential contaminants.Casing will not be <br /> • Location of the boring; removed from the wrapping until immediately <br /> before it is to be placed in the boring. <br /> • Type of drill rig; <br /> 4.2 Piezometer Screen <br /> • Size and type of drilling method used; <br /> Each piezometer screen will consist of a 1-inch- <br /> • Depth at which groundwater was first nominal-diameter, Schedule 40 PVC continuous <br /> encountered; slot screen with flush threads.All screen <br /> openings will widen inward so as to be non- <br /> • Depth to the static water level and changes clogging.The precise screen depth and slot size <br /> in static water level with hole depth; will be determined based on the lithology <br /> encountered during the drilling of the piezome- <br /> • Total depth of the hole; tens.The screen will be of sufficient size and <br /> design to hold back and support the filter pack <br /> • Depth or location of any problems and in situ soils surrounding the screen.The well <br /> encountered(i.e.,heaving sands); screen surface will be free of solvents,oils, <br /> grease,paint, and dirt and will be certified clean <br /> • Lithologies of soil layers encountered; from the factory or steam-cleaned on site <br /> KAWpnxess\00701\Trecy\0UJ Pst PZ Abnd\DRAFntext.dm 2 June 2004 <br />