My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJacy OU 1 Pesticide Remediation <br /> Groundwater Piezometer Abandonment and Installation Work Plan <br /> prior to installation.The well screen will have and then tremied in place.No accelerator will be <br /> smooth, sharp-edged openings free of burrs, added to the grout. Guidelines for the installa- <br /> chipped edges,of broken pieces on the interior tion of the grout seal are presented in the DD✓C- <br /> and exterior surfaces of the pipe. Sections of the Sharpe/Tracy Comprehensive Field Work Plan <br /> screen will be received from the supplier Field Procedures(URS,2004c). <br /> wrapped in polyethylene protective wrappers <br /> with sealed ends to limit exposure to potential 4.6 Wellheads <br /> contaminants.Wrapping will not be removed <br /> until the screen is to be used. Once the grout seal has been tremied into place <br /> and time has elapsed to allow for the grout to <br /> 4.3 Filter Pack cure,a locking steel casing will be installed <br /> around the piezometer casing and set into a <br /> The filter pack material will be composed of concrete pad.Bollards consisting of concrete- <br /> round,hard,water-wom siliceous sand and be filled,4-inch-diameter steel pipe will be cast <br /> free of flat or elongated pieces,organic matter, into the concrete slab.Details describing the <br /> or other foreign matter. All filter pack material surface completion are presented in the DDJC- <br /> will be protected from contamination prior to Sharpe/Tracy Comprehensive Field Work Plan <br /> placement by either storing it in plastic-lined Field Procedures(URS, 2004c). <br /> paper bags or on plastic sheeting in a location <br /> protected from the weather and contamination. 5.0 POST-PIEZOMETER- <br /> All filter pack material will be placed in the INSTALLATION ACTIVITIES <br /> annular space in the borehole by using a 2-inch <br /> tremie pipe.A complete description of the 5.1 Investigation-Derived Waste <br /> guidelines to be used for the installation of filter <br /> pack material is presented in the DDJC- Investigation-derived waste(IDW)will be <br /> Sharpe/Tracy Comprehensive Field Work Plan managed in accordance with the procedures <br /> Field Procedures(URS, 2004c). described in the DDJC-Sharpe/Tracy Compre- <br /> hensive Field Work Plan Field Procedures <br /> 4.4 Bentonite Seal (URS,2004c)and the DDJC-Sharpe/Tracy <br /> The piezometers will be constructed with a Waste Management Plan(URS,2004d). <br /> bentonite seal placed above the filter pack to 5.2 Piezometer Location Surveying <br /> protect the filter pack during grouting.The <br /> bentonite seal will consist of bentonite pellets or Horizontal coordinates will be determined to the <br /> chips. Once the seal is in place,the interval will closest 1.0 foot and referenced to the State Plane <br /> be hydrated for a minimum of 30 minutes, Coordinate System,Zone 3,North American <br /> before grouting occurs. Guidelines for the Datum of 1983. Ground surface and top-of- <br /> installation of the bentonite seal are presented in casing elevations will be obtained at the <br /> the DDJC-Sharpe/Tracy Comprehensive Field piezometers to the closest 0.1 foot and 0.01 foot, <br /> Work Plan Field Procedures(URS,2004c). respectively.These elevations will be referenced <br /> to the National Geodetic Vertical Datum of <br /> 4.5 Cement Grout 1988. <br /> A cement grout will be used to fill the annular 5.3 Groundwater Water Level <br /> space above the hydrated bentonite seal.Cement Measurements <br /> grout will consist of Type II Portland cement <br /> with 3 pounds of powdered non-beneficiated Water level measurements will be collected <br /> bentonite and 7 gallons of water per 94-pound from the piezometers quarterly as part of the <br /> sack of cement. The cement grout will be annual monitoring program.Data collection will <br /> mechanically mixed with a paddle-type mixer be performed in accordance with procedures <br /> KAWpr ess\00701\Tmcy\0U1 Pst PL AWORAFINtext m 5 June 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.