Laserfiche WebLink
• DD*racy OU I Pesticide Remediation <br /> Groundwater Piezometer Abandonment and Installation Work Plan <br /> outlined in the DDJC-SharpelTracy Compre- <br /> hensive Field Work Plan Field Procedures <br /> (URS, 2004c). <br /> 5.4 Data Management <br /> 5.4.1 All data collected from location surveying <br /> and water level measurements will be incorpor- <br /> ated into the DDJC-Sharpe/Tracy Environmental <br /> Data Management System(EDMS)database. <br /> Data receipt,data loading, and the data quality <br /> control will be performed under the EDMS task <br /> of Task Order CM01. <br /> 5.4.2 Electronic versions of all documents <br /> (i.e.,CD-ROMs)will be prepared and submitted <br /> according to the procedures described in the <br /> Electronic Document Submittals(#RD-ST-002) <br /> for the DDJC-Sharpe/Tracy program. <br /> 6.0 REFERENCES <br /> URS,2002.DDJC-Tracy Operable Unit I <br /> Pesticide Remediation Extraction Well <br /> Installation Work Plan. September. <br /> URS,2003. DDJC-Tracy Operable Unit I <br /> Pesticide Remediation Aquifer Test <br /> Results for EW047AU and EW048AU. <br /> Draft.April. <br /> URS,2004a.Recommendation of Temporary <br /> Piezometersfor Abandonment, Pesticide <br /> Extraction Well Field, DDJC-Tracy. <br /> Memorandum dated 16 June 2004. <br /> URS,2004b. Proposed Temporary Piezometer <br /> Abandonment, Pesticide Extraction Well <br /> Field, DDJC-Tracy.Memorandum <br /> dated 16 June 2004. <br /> URS,2004c.DDJC-SharpelTracy Comprehen- <br /> sive Field Work Plan Field Procedures. <br /> May. <br /> URS,2004d.DDJC-SharpelTracy Waste <br /> Management Plan.April. <br /> KAWprmcss\00701\Tmcy\0UI Pst PZ Abnd\DRAFt\text.doc 6 June 2004 <br />