Laserfiche WebLink
• • Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Zac Crawford [zcrawford@engeo.com] <br /> Sent: Tuesday, May 05, 2009 4:17 PM <br /> To: Tracie Sakakihara <br /> Cc: Umezaki, Dave; Fio, John; bmyers@pacificunionhomes.com; Mike Infurna [EH] <br /> Subject: Community Park Monitoring Well Installation Addendum <br /> Attachments: 8617000000_2009-05-05_Mossdale Landing Community Park—Summary of Monitoring Well <br /> Instal lation.pdf <br /> Good afternoon Tracie, <br /> Attached is the Well Installation Summary for the replacement of MWM-10 at Mossdale Community Park. Could <br /> you please forward this to the Regional Board? It is my understanding that submittal of this report to the RWQCB <br /> will complete the requirements set forth in the Master Groundwater Well Installation Work Plan. Please let me <br /> know if you have any questions. <br /> Thanks, <br /> Zac Crawford,PG <br /> Project <br /> ENGEO <br /> I N C 4 F P O p A T E D <br /> ENGEO Incorporated <br /> 580 N.Wilma, Suite A <br /> Ripon, CA 95366 <br /> (209) 835-0610 Phone <br /> (888)279-2698 Fax <br /> -Expect Excellence- <br /> """'Due to the potential that information by electronic media can deteriorate,be damaged,lost or modified unintentionally or otherwise,use <br /> of this electronic data by anyone other than ENGEO Incorporated shall be at the sole risk of such user and without liability or legal exposure to <br /> ENGEO Incorporated. The recipient is responsible for verifying the accuracy of data against governing hard copy documentation. Recipient <br /> assumes all risks in the changing or modification of data and revisions or updating of hard copy documents....-- <br /> 5/6/2009 <br /> ocuments.."" —5/6/2009 <br />