My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS 3RD QUARTER 2009 (1)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
ARCHIVED REPORTS 3RD QUARTER 2009 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:49:23 AM
Creation date
5/30/2019 10:30:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
3RD QUARTER 2009 (1)
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXPLANATION <br /> Monitoring Well with 3rd Quarter <br /> 2009 TDS Concentration, mg/L <br /> 710 0 Crossroads WWTF Network <br /> 930 <br /> WRP-1 Network 19 <br /> TDS Contour, in mg/L <br /> 0 Land Application Site 0 750 1,500 <br /> 0 Storage Pond Feet <br /> oArcy PkWy 2,00 LAS-3 710 <br /> CL o0 0 1,000 tea. <br /> , 1,910 ry� <br /> s% a <br /> EL � o <br /> Z <br /> 3,000LAS-2 2,5000 <br /> 3,480 <br /> Neste Wa 0 2,310 1,740 <br /> 00 <br /> O <br /> 2,750 <br /> a <br /> e� <br /> LAS �S�epr 930 Pond <br /> X00 1,780* S5 WRP-1 MBR Water <br /> O Pon Recycling Plant <br /> Pond S , ' 970 <br /> 3,100 A Pond o� <br /> nd C o <br /> B <br /> 2,1800 1,280 <br /> Crossroads Wastewater <br /> Treatment Facility <br /> 120 <br /> Water samples from Crossroads WWTF network wells were collected <br /> by FGL Environmental on 7/27/09. Water samples from WRP-1 <br /> network wells were collected by HydroFocus on 7/27/09. <br /> HYDROFOCUSJ Total Dissolved Solids Concentrations, 3rd Quarter 2009, Figure <br /> Crossroads Wastewater Treatment Facility. 5 <br /> PROJECT: 5040 DATE: 9/11/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.