My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS 3RD QUARTER 2009 (1)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
ARCHIVED REPORTS 3RD QUARTER 2009 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:49:23 AM
Creation date
5/30/2019 10:30:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
3RD QUARTER 2009 (1)
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXPLANATION <br /> Monitoring Well <br /> • Crossroads WWTF Network <br /> WRP-1 Network <br /> s.1 NO3 Concentration, in mg/L <br /> ND Total Kjeldahl Nitrogen, in mg/L <br /> NO3 Contour, in mg/L <br /> 0 750 1,500 <br /> 0 Land Application Site I I I <br /> 0 Storage Pond Feet <br /> 10.9 <br /> �ArcY Pkwy LAS 28 <br /> a 20 4a. <br /> 30 ca <br /> 8.1 • 10 40 0 <br /> 10.6 <br /> 13.4 ND • <br /> ND 4.1 52 <br /> Nest/e Vya • ND ND <br /> .AS-2 <br /> 2.2 2.3 <br /> 14.3* Pond <br /> f� 0.83* S5 WRP-1 MBR Water <br /> qAaPond l` / Pond Recycling Plant <br /> ret <br /> 1.6 <br /> Grt�s'�°ND • A Pond S <br /> 1.0 <br /> ND Pond C 011 <br /> B <br /> • ND <br /> ND ND <br /> ND Crossroads Wastewater <br /> Treatment Facility <br /> 120 <br /> Water samples from Crossroads WWTF network wells were collected <br /> by FGL Environmental on 7/27/09. Water samples from WRP-1 <br /> network wells were collected by Hydro Focus on 7/27/09. <br /> Nitrogen Concentrations, 3rd Quarter 2009, Figure <br /> Crossroads Wastewater Treatment Facility. 6 <br /> PROJECT: 5040 DATE: 9/9/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.