My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyn tec� <br /> consultants <br /> Grab groundwater samples will be collected from the sandy zone typically encountered <br /> at 30 to 40 ft bgs by either hydropunch or by temporary well. Groundwater samples <br /> will be collected in 40-mL volatile organics analysis vials (VOAs) and analyzed by the <br /> mobile analytical laboratory for VOCs�by EPA Method 8260. Step-out.borings will be <br /> completed as needed to delineate the lateral extent of dissolved toluene. <br /> 5.4 Quality Assurance/Quality Control <br /> .During this.investigation, duplicate groundwater'samples will be collected at a rate of <br /> 10% and submitted blindly to the mobile analytical lab for analysis of VOCs by EPA <br /> Method 8260. <br /> 5.5 Site Restoration and Investigation-Derived Waste. <br /> i <br /> Soil borings will be grouted with neat,cement placed by the tremmie method from the <br /> bottom up. All grouting will be conducted under the supervision of the County. <br /> Ground surfaces will be completed to match surrounding surfaces (e.g., dirt, asphalt, <br /> concrete). <br /> Soil cuttings, decontamination water, and purgewater generated during investigation <br /> activities will be labeled and stored at the Site in Department of Transportation- <br /> approved containers pending characterization and disposal at an appropriate off Site <br /> facility. <br /> Monitoring Well Installation Report 9 21 January 2013 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.