My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dopaco, Inc. - 3 - 18 September 2012 <br /> 800 W. Church St., Stockton <br /> San Joaquin County <br /> The Report states the wells will be installed, developed, surveyed, and sampled within <br /> 45 days of Regional Board staff approval. <br /> Comments: <br /> The approved Workplan stated that the screened intervals would be set based on actual <br /> field conditions. DMW-1 and DMW-4 appear to be adequately sited as proposed to <br /> begin monitoring the toluene plume, based on current and historical concentrations <br /> reported in groundwater, and a groundwater plume map drawn over Figure 5 by this <br /> Report reviewer. However, the locations for DMW-2 and DMW-3 need to be closer to <br /> the source area, to better monitor the groundwater plume. Moving DMW-3 will also <br /> provide additional delineation towards the southeast of the groundwater plume. Also, <br /> an additional shallow well screened above the sand unit needs to be installed between <br /> B-1 and CPT-MIP-2012-13 (source area). Therefore, the Report recommendations are <br /> approved with the following modifications. <br /> 1. Figure 7, the cross section of proposed wells, shows a 10' screen, not the 5' screen <br /> proposed in the text. The well screens length and depths shall be based on field <br /> conditions and professional judgment exercised in the field. <br /> 2. DMW-2 and DMW-3 shall be moved to a distance approximately half of their <br /> proposed locations on Figure 5 (DMW-2 approximately 20' to the east of the <br /> proposed location, DMW-3 approximately 20' to the east of the proposed location). <br /> 3. Add a source area monitoring well (DMW-5) screened from approximately 10' bgs to <br /> no deeper than 30' bgs (CPT-MIP-2012-13 depth to water was 22' bgs, B-1 depth to <br /> water was 16' bgs in 2005) entirely in the fine grained unit. Since there are GPS <br /> coordinates for CPT-MIP-2012-13, I strongly suggest DMW-5 be located at the <br /> corresponding CPT grab groundwater position. <br /> 4. Groundwater sample analyses for USEPA Method 8260B will continue to report all <br /> peaks, including toluene, in the data provided in the reports. <br /> 5. In addition to the previously proposed and approved Workplan submittals not <br /> included in the Report, include all of the field notes (the Report's and the future wells <br /> installation) in the final report, which is due 90 days from the date of this approval <br /> letter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.