Laserfiche WebLink
Attachment A Geosyntec Consultants <br /> Monitoring Well Installation and Development Procedures <br /> Disposition of Waste Materials <br /> There will be some decontamination water generated during field work in addition to the purge <br /> water and soil cuttings. Before leaving the Site, Geosyntec will collect a composite sample of <br /> the purge water and decontamination water and a composite sample of the soil cuttings for waste <br /> classification. Following classification, the waste will be disposed of at an appropriate off-site <br /> facility. <br /> i <br /> i <br /> Page 4 of 4 January 2014 <br />