My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec O <br /> consultants <br /> 2. �DITIONAL SOIL CHARACTERIZATION IN THE CPT-13 AREA <br /> In the Report/Work Plan, the collection of soil and soil gas samples was proposed as <br /> follows: <br /> • Soil samples shall be collected from a depth of five ft bgs prior to installation of <br /> temporary soil gas wells at two locations in the CPT-13 Area, shown in Figure <br /> 2; and <br /> • Soil gas samples shall be collected from a depth of five ft bgs. <br /> In order to improve characterization of the shallow soil prior to.excavation, soil samples <br /> shall also be collected from 10 ft bgs. Soil samples will be collected in triplicate Encore <br /> samplers and analyzed for volatile organic compounds (VOCs) by EPA Method 8260 <br /> by Curtis & Tompkins Laboratory. The temporary soil gas wells will be constructed in <br /> separate, adjacent borings. <br /> i <br /> The pre-investigation activities, quality assurance/quality control, site restoration, and <br /> investigation-derived waste (IDW) will be conducted as presented in .Section 7 of the <br /> Report/Work Plan. <br /> I <br /> i <br /> I <br /> ` I <br /> Addendum 1 to CPT-13 Area Investigation <br /> Report and Work Plan 2 28 June 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.