My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
639
>
3500 - Local Oversight Program
>
PR0544513
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 5:00:53 PM
Creation date
5/31/2019 4:53:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544513
PE
3528
FACILITY_ID
FA0024115
FACILITY_NAME
WEST CLAY PROPERTY
STREET_NUMBER
639
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14707110
CURRENT_STATUS
02
SITE_LOCATION
639 W CLAY ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1./ <br /> 23 December 2005 <br /> AGE-NC Project No. 96-0235 <br /> Page 2 of 3 <br /> • 01 April 2005 -soil sample collected from the former northern UST area for the Ozone Injection- <br /> Bench Scale Pilot Study. 05 April 2005 -ground water samples collected from well MW-10 were <br /> submitted with soil to Mc Campbell Analytical(MAI) for the Bench Scale Pilot Study. <br /> • 29 April 2005-the Ozone Injection-Bench Scale Pilot Study report was supplied by MAI for AGE <br /> to review and comment. The Bench Scale Pilot Study report was submitted to the EHD and the <br /> Board on 12 May 2005. <br /> • 15 June 2005 -Off-site Assessment Work Plan was prepared,approved by West Clay Property and <br /> submitted to the EHD. 10 August 2005 -work plan approved. <br /> • 16 September 2005 -the Comments approving the Bench Scale Pilot Study from the Board were <br /> received by electronic mail. 30 September 2005 the EHD reviewed the Bench Scale Pilot Study <br /> report under direction of the Board direction of reducing the number of ozone injection well <br /> locations. <br /> • 21 to 23 September 2005 -off-site grab water sampling conducted to defined the southern extent of <br /> the dissolved hydrocarbons in Clay Street. <br /> • 03 October 2005-the EHD directed the submittal of a revised(reduced)Ozone Injection Pilot Study <br /> Work Plan. <br /> • 10 to 19 October 2005-deep ground water monitoring wells installed near the former southern UST <br /> location and one shallow well (EW-1) was reinstalled near the former northern UST area. <br /> Development and sampling of the newly installed wells followed. <br /> • 27 October 2005 -the Ozone Injection Pilot Study Work Plan was submitted to the EHD,reducing <br /> the number of ozone injection well locations from ten to four. The location of the ozone injection <br /> well locations remained near the former northern UST area. <br /> • 09 November 2005 - a meeting was conducted on-site to discuss the Ozone Injection Pilot Study <br /> Work Plan and the data collected from the off-site assessment and newly installed monitoring wells. <br /> • 06 December 2005 -a site assessment/ground water monitoring report was submitted to the EHD. <br /> 22 December 2005 a meeting was conducted on-site to discuss the Ozone Injection Pilot Study Work <br /> Plan and the data collected from the off-site assessment and newly installed monitoring wells. <br /> At the direction of the EHD,two additional shallow ground water monitoring wells were proposed <br /> to be installed south and southeast of the former northern UST area to fill a general data gap at the <br /> southern edge of the northern UST area,thus allowing observation point near ozone injection wells <br /> to evaluate the performance of the ozone injection pilot study. The monitoring wells construction <br /> should replicate the current shallow well network. The proposed well screen interval for the new <br /> wells is a total depth of 40 feet with 20 feet of well screen. The ground water sampling and <br /> monitoring wells will be installed and sampled according to procedures detailed in the AGE- <br /> prepared Monitoring Well Installation Work Plan-March 1998,dated 31 March 1998 and approved <br /> by the EHD by letter dated 11 May 1998, and Monitoring Well Installation Work Plan Addendum (/" <br /> dated 20 September 2001 and approved by the EHD by letter dated 21 September 2001. The <br /> proposed observation well locations are depicted on Figure 2. Z Nj Ws <br /> Advanced GeoEnviron mental,Inc. V)'qA- c <br /> V <br /> U90M <br />
The URL can be used to link to this page
Your browser does not support the video tag.