My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
215
>
3500 - Local Oversight Program
>
PR0544559
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:05:12 PM
Creation date
6/13/2019 2:54:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544559
PE
3528
FACILITY_ID
FA0009944
FACILITY_NAME
N&S IRRIGATION
STREET_NUMBER
215
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25906072
CURRENT_STATUS
02
SITE_LOCATION
215 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After the sealing material has set in wells MW1 through MW3, the excavations will be filled to <br /> within approximately 3 inches of surface grade with an aggregate material and the remaining 3 <br /> inches will be filled with asphalt patch or concrete to restore the site's appearance. <br /> Based upon well construction details and assuming the filter pack for each well has an estimated <br /> porosity of 25% (Heath, R. C., 1983), an estimated volume of approximately 91 gallons of grout <br /> will be used to abandon wells MW1 through MW3. Monitoring well construction data, soil <br /> boring logs, and grout volume calculations are attached. One permit application and associated <br /> fees (check no. 1087) are attached. The application is for the destruction of the three on-site <br /> monitoring wells. <br /> Report Preparation <br /> Upon completion of the well destruction activities, a summary report will be prepared for <br /> submittal to San Joaquin County Environmental Health Department (SJCEHD). The report will . <br /> include a description of all field activities. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed,in.accordance with ATC's Site <br /> Safety Plan and Quality Control/Quality Assurance Plan for this site, on file at SJCEHD. <br /> Projected Schedule <br /> ATC has tentatively scheduled field activities for December 2005. Once approval of this <br /> workplan has been received, ATC will confirm the schedule for drilling activities. ATC will <br /> notify SJCEHD at least 48 hours prior to beginning any field activities. The summary report will <br /> be submitted to SJCEHD approximately two weeks after the completion of field activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.