Laserfiche WebLink
-w•5 <br /> 1 <br /> 20 September 2001 <br /> AGE-NC Project No 96-0235 V <br />' Page 6 of 8 <br /> 1 <br /> 5 <br /> DOT-approved 55-gallon drums, and stored on-site in an area lacking public access Disposal <br /> alternatives will be evaluated at a later date=based on laboratory results of rinseate _ <br /> A second soil boring will be located adjacent the first CPT boring for ground water sample <br /> collection Based on CPT findings, discrete grab groundwater samples will be collected in saturated <br /> intervals of porous and permeable material beginning at a depth of approximately 40 feet bsg A y <br />' HydroPunch sample tool will be pushed into the specified zone, then withdrawn approximately five <br /> feet to expose an inlet screen The Interior of the sampling tool fills with water and a 1-inch outer <br /> diameter (O D) stainless steel bailer will be lowered and,utilized to extract a ground water sample <br /> All soil borings will be'backfilled over their entire depth with a portland cement grout mix <br /> Following,sample collection, the sannples will be placed in laboratory- Pp su lied containers, be <br />' labeled, and will be transported under chain-of-custody to a DHS-certified laboratory <br /> Proposed CPT boring locations are Illustrated on Figure 2 Following borehole advancement, <br /> portland cement (grout mix) will be utilized to backfill each borehole utilizing a tremae pipe The <br /> PHS-EHD will be given the opportunity to inspect the grout mix prior to,backfilling activities <br /> 1 <br /> 3 2 GROUND NATER EXTRACTION WELL PILOT BORING AND COMPLETION <br /> The pilot soil boring will be advanced to a depth of approximately 50 feet bsg utilizing a truck— <br /> mounted, hollow-stem dnll rig equipped with 12-Inch diameter hollow-stem augers Cuttings <br /> generated during drilling will be placed on plastic sheeting and covered Rinseate will be <br /> containerized in properly labeled DOT-approved 55-gallon drums, and stored on-site in an area <br /> lacking public access Disposal alternatives will be 'evaluated based on results of soil and water <br /> analysis ` <br /> The pilot soil boring will be completed as a ground water extraction well utilizing a six-inch <br /> diameter Schedule 40 PVC'0 020-mch slotted,well screen and casing A 20-fo6t section of well <br /> screen will,be installed from a_depth_of approximately 30 feet to 50 feet bsg with blank casing , y <br /> extending to surface grade i <br /> After installing the well casing, filter pack material consisting of pre-washed #3 Lonestar sand will <br /> be added from the bottom of the borehole to approximately two feet above the screened interval as <br /> the augers are slowly pulled upward Following placement of the filter pack, the well will be surged <br /> to assist settling the filter pack,, Additional sand will be added if settling occurs AGE's extensive <br /> experience,installing extraction wells in San Joaquin County has shown those materials generally <br /> ' result mwells that can be surged,' developed and that produce ground water with minniial sediment <br /> A nominal five-foot'bentonite seal will be placed above the filter pack Bentonite chips will be <br /> 1� ` Advanced GevEnvironmentai,Inc <br />