Laserfiche WebLink
c <br /> , <br /> t <br /> r <br /> r 20 September 2001 <br /> AGE-NC Project No 96-0235 <br />' Page 7 of 8 <br /> hydrated using five gallons of potable water The casing, filter pack and well-sealing materials will <br />' be placed into the borehole through the intenor of the hollow-stem augers <br /> The remaining annular space will be filled within one foot of surface grade with a cement grout The <br /> out mixture will consist of Type 911 portland neat cement and not more than 6-gallons of water per- <br /> ' - <br /> 94-pound sack of cement The grout will be placed by pumping through the hollow stem augers The <br />' PHS-EHD will be notified at least 48 hours before initiation of field work to schedule the grout <br /> inspection A traffic-rated well box will be installed over the well, in. accordance with county <br /> regulations A proposed well construction diagram is depicted in Figure 3 <br /> 3 3 24-HOUR AQUIFER PUMPING TESTS , <br /> A submersible water pump will be utilized to induce a decline in static water level in extraction wells <br /> EW-1 and EW-2 during seperate 24-hour aquifer pumping tests Sohnst Levelogger transducers will <br />' be deployed in wells EW-1, MW_10, MW-11A and MW-6A during the EW-1 pumping test and in <br /> " wells EW-2, MW-2, MW-1 and MW-8B during the EW-2 pumping test Information recorded on <br /> R the transducers will be used to obtain drawdown measurements at 1-minute intervals to measure <br /> differences in ground water levels before and during well pumping Additionally, depth to water <br /> measurements from the mentioned wells will be recorded every 30 minutes using a Solmst water <br /> level meter Depth to water will also be monitored from outboard wells with the Sohnst to detect <br /> natural water level movements - <br /> AGE plans to utilize 4 Levelogger Model 3001 instruments to collect the water level data The _ <br /> Levelogger's utilize ceramic pressure transducers to measure water levels The devises record the <br /> information during the test and can be downloaded to a computer via an RS232 Optical infra-red <br /> data reader/port connected to the computer <br /> On 19 July 2001 an 8-hour aquifer pumping test was conducted utilizing EW-2 as the extraction <br /> well Based on the results of the 8-hour pumping test, a constant ground water pumping rate of <br />- ' 4 gallons per mini to(GPM)willbe utilized for the 24-hour aquifer pump test proposed for the UST <br /> No 3 location A constant ground water pumping rate will be determined for the former UST cluster <br /> ' location from the results of the 8-hour pump test proposed in Feasibility Pilot Test Work Plan,dated <br /> 31 January 2000 The ,ground water will be extracted utilizing a submersible, 4-mch diameter <br /> Grundfos Rediflow self priming submersible pump If the decline of the ground water level is not <br /> satisfactory within the first eight hours of the;pilot test, additional testing will be performed to <br /> achieve sufficient ground water drawdown <br /> Advanced GeoEnviranmental,Inc <br /> j ` l <br />