Laserfiche WebLink
_ � , -.< _ - ' •" - .�._ ' .• - 5. •ate _�f_ - <br /> TABLE OFXONTENTS <br /> - Paged ` <br /> 1.0. INTRODUCTION 1'- - <br /> 2.0. PROCEDURES <br /> _.2.1. - REGIONAL GEOLOGIC SETTING .': . : . .. . . . . . . .':.: : :'... . :�:... . . 1 <br /> .2.2. UNDERGROUND STORAGE-TANK REMOVAL_ . . : :_`•-:;.--:-._.2. . : <br /> 2.3. - .PREVIOUS INVESTIGATIONS 4i <br /> 2.4: GROUNDWATER DEPTH AND FLOW DIRECTION'--.. 31 <br /> 3.0. SCOPE OF WORK ._ . .`. . . 3', <br /> 3.1: PERMITTING.AND PRE-FIELD WORK ACTIVITIES . . .. . :,.:,. . 4: <br />:. 3.2. SOIL SAMPLE COLLECTION AND ANALYSIS :.f...-. : . . . - =. :...,:.4;', <br />{ 3.3: . MONITORING WELL INSTALLATION AND DEVELOPMENT.. : . . .,".4.,- <br /> 3.4..- GROUND WATER MONITORING PROGRAM � .,: 5' <br /> 3.5. REPORT.PREPARATION 5. <br /> 4.0. FIELD PROCEDURES _ .. . . ; . . 6 <br /> -4.1. SOIL SAMPLING PROCEDURES - . : r' 6 . <br /> 4.2. MONITORING WELL INSTALLATION. . . . . <br /> -4.3.- WELL DEVELOPMENT; . . . . . . . . . . . T <br /> -4.4. GROUNDWATER SAMPLING PROCEDURES' 7 <br />-E - 4.4.1. Static_ Water Level Measurerrierits <br /> - 4.4.2. .Well Evacuation -� L F 8' <br /> 4.4.3. Sample Withdrawl . . .. g <br /> 4.4.4. Sample Handling . . . ... ... . . <br /> y 4.5. ' EQUIPMENT DECONTAMINATION.-., . - . . . . . ` . . . . 9. . . <br /> , <br /> t FIGURES' <br /> - - .Figure 1 -Locdtion Ma <br /> ~Figure 2 - Site Plan <br /> Figure 3 -Proposed Well Design fi <br /> TABLES <br /> Table 1 -Analytical Results of Soil Samples = USTIPiping Removal <br /> Table.2 -Analytical Results of Soil-Samples _EPA Methods.8015M/802.1 <br /> Table 3 -Analytical.Results:of Soil S'drrtples<-EPA'Method.8260B f. <br /> ' -Table 4 -_Analytical Results of.Ground Water Samples -EPA:Method 8015M/8021 <br /> Table 5 -Analytzc'd1 Results of Ground.Water Samples-=EPA." Method 82.60B <br /> •-> <br /> ffldvw ced Geo nvfronmental,Inc.' <br />