My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
11401
>
2200 - Hazardous Waste Program
>
PR0514190
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 9:46:56 AM
Creation date
6/17/2019 9:31:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514190
PE
2220
FACILITY_ID
FA0010135
FACILITY_NAME
MICKE GROVE GOLF COURSE
STREET_NUMBER
11401
Direction
N
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
Zip
95240-9426
APN
05910002
CURRENT_STATUS
01
SITE_LOCATION
11401 N MICKE GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/17/2008 08:35 FAX 12093698635 MickeGroveGolf 1j006/009 <br /> October 2004 10 033-9649.17 <br /> • Monitoring-Collect and analyze runoff samples from the first two storms during the wet <br /> season(October l-May 30); and <br /> • Quality Assurance— Implement management procedures to ensure that appropriate staff <br /> implements all elemcnts of the SWPPP. <br /> 5.1.2 Structural BMPs <br /> Structural BMPs involve the construction of a structural device that reduces or prevents <br /> pollutants in storm water discharges. Structural BMPs are usually implemented when non- <br /> structural BMPs (Section 5.1.1) are ineffective. The following structural BMPs are considered: <br /> • Overhead Coverage-Provides horizontal coverage of materials, chemicals, and pollutant <br /> sources from contact with storm water; <br /> • Retention Ponds-Prevents storm water discharge from the facility; <br /> • Control Devices-Channels or routes run-on and runoff away from pollutant sources; <br /> • Secondary Containment-Collects and contains leaks or spills from storage areas; and <br /> • Treatment-Reduces pollutants in storm water discharges by implementing inlet controls, <br /> infiltration devices, clarifiers, detention ponds, etc. <br /> 5.2 Assignments to Implement the Bl►'1[Ps <br /> The planned non-structural and structural BMPs listed in Table l are to be implemented in 2004. <br /> The GM is responsible for the existing and future BMPs shown in Table l. <br /> Colder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.