Laserfiche WebLink
f <br /> 0 <br /> Ms. Jill Jefferson - 2 - 30 November 1999 <br /> 30 gpm, which would result in at least a 10-fold increase in the amount of groundwater it current <br /> treats. <br /> 2. The addendum to the work plan proposes conducting the capture zone analysis at 10 gpm-and <br /> seven gpm. This modification to the initial work plan is acceptable, but KMEP shall also <br /> conduct this analysis at the three-gpm treatment rate. Based on the results of this study, KMEP <br /> shall propose a remedial strategy that allows for contaminant plume capture. The work plan <br /> addendum says that it will take about 10 weeks from Board staff approval to complete this work <br /> and submit a report. KMEP must notify me as soon as it knows that it cannot adhere to this <br /> schedule. <br /> 3. As specified in Appendix B of the General Order for Discharge of Groundwater from Cleanup <br /> of Petroleum of Petroleum Fuel Pollution to Sui face Waters KMEP is required to submit an <br /> annual report of its monitoring and corrective actions. This annual report is due by 30 January <br /> 2000. <br /> 4. In the 12 May 1999, Combined Annual Groundwater Monitoring Report, Results of Further <br /> Investigation and Recommendations for Additional Work, KMEP proposed to install a soil vapor <br /> extraction(SVE) network consisting of 15 extraction wells. We approved this work in our <br /> 16 July Requirement for Documents Pursuant to Water Code Section 13267. The Status Report <br /> for the Installation of a Soil Vapor Extraction and Treatment System submitted on 22 October <br /> 1999 says LFR had only nine SVE point locations surveyed. This change in the approved work <br /> plan was made without Board staff notification. The status report does not detail the SVE <br /> design, so it is impossible to determine if the revised design is adequate. LFR also has not <br /> completed the SVE system installation despite our 16 July approval. In part, the basis for the <br /> 16 July enforcement letter was the inability of KMEP to implement its approved work plans. <br /> 5. The Deeper Groundwater Investigation and Work Plan for Well Installation, dated 22 October <br /> 1999, shows benzene, toluene, ethylbenzene, xylene (BTEX) and total petroleum hydrocarbons <br /> in the gasoline range (TPHg) are present to a depth of about 62 feet below ground surface (bgs) <br /> at CP-2. The work plan proposes sampling the sand intervals encountered at about 73 feet bgs at <br /> CP-2 and 65 feet bgs at CP-4. Subsequent to obtaining the results from this sampling event, <br /> three monitoring wells shall be placed near CP-1, 2 and 4 such that they monitor the deepest <br /> groundwater impacted by the release of KMEP's petroleum products to the environment. This <br /> work plan, as modified in this comment, is approved. The work plan says that it will take about <br /> eight weeks from Board staff approval to complete this work and submit a report. KMEP must <br /> notify me as soon as it knows that it cannot adhere to this schedule. <br /> Please submit the following documents by the dates shown. <br /> 1. By 28 January 2000, a technical report that evaluates the performance of the groundwater interim <br /> treatment system and provides optimal pumping rates. <br /> 2. By 28 January 2000, a report of findings and a well installation report for the deeper groundwater <br /> investigation and well installation. <br />