My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ys'<�O�F CALIFORNIA REGIAL WATER QUALITY CONTROL BOAR <br /> Cal/EPA <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Phone(916)255-3000 <br /> FAX(916)255-3015 Pete Wilson,Governor <br /> 15 October 1997 <br /> Mr. Mark Sandon <br /> Santa Fe Pacific Pipeline Partners <br /> 1100 Town& Country Road <br /> Orange, CA 92868 <br /> REQUEST FOR WORKPLAN,SANTA FE PACIFIC PIPELINE PARTNERS,HOLT ROAD <br /> RELEASE SITE, SAN JOA QUIN COUNTY <br /> Thank you for meeting with Board staff on 8 October 1997 to discuss the status of the investigation and <br /> remediation of the Santa Fe Pacific Pipeline (SFPP) release at Holt Road in San Joaquin County. I <br /> understand that the groundwater extraction and treatment system was installed in September 1995, but <br /> due to numerous technical difficulties, has been running continuously only since June of this year. <br /> Treated groundwater is discharged to Trapper Slough under an NPDES permit. The first NPDES <br /> quarterly monitoring report was submitted to the Board on 24 July 1997. Future NPDES monitoring <br /> reports will be submitted directly to me. <br /> As we discussed, there are several issues Therefore, by 1 December <br /> 1997, please submit a workplan to (a) c, Sf�� `.-Ig extraction wells, <br /> (b) install an additional monitoring we] ie the source of the <br /> low concentrations of ethylbenzene, x, xface water samples. <br /> If you have any questions, I can be re <br /> IA was <br /> WENDY WYELS <br /> Site Cleanup Unit <br /> cc: Mr. Mika, San Joa ;nt, Stockton <br /> Mr. Scott Seyfried, Levin_ <br /> Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.