My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA-Environmental Proteclagency PETE WILSON Govemor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road,Suite A <br /> Sacramento,CA 95827-3098 j r: 17 <br /> a _ <br /> PHONE:(916)255-3000 <br /> FAX:(916)255-3015 <br /> 26 February 1996 <br /> Mr. Tom McLane <br /> Santa Fe Pacific Pipeline Partners, L.P. <br /> 888 South Figueroa Street <br /> Los Angeles, CA 90017 <br /> ANNUAL GROUND WATER MONITORING REPORT AND STATUS OF GROUND <br /> WATER REMEDIATION PROJECT, SANTA FE PACIFIC PIPELINE RELEASE SITE, <br /> HOLT, SAN JOAQUIN COUNTY <br /> I have reviewed the 30 January 1996 Annual Ground Water Monitoring Report prepared by <br /> Terra Services and your 30 January 1996 letter which summarizes the remedial activities at the <br /> Santa Fe Pacific Pipeline release site in Holt. A plume of free product underlies the site, and a <br /> remediation system was constructed in September 1995. The system needs to be modified to <br /> prevent plugging by fine-grained soils. In the meantime, free product is not being removed, the <br /> plume is not fully-defined, and the most upgradient well adjacent to a surface waterway has <br /> elevated concentrations of petroleum constituents. I have the following comments regarding the <br /> project. <br /> A schedule with particular calendar dates needs to be submitted to re-start the ground water <br /> remediation system. After the remediation system has been running for three months, a capture <br /> zone analysis is needed to show the effectiveness of the remediation system at capturing the <br /> l______ The 'A c schedule to re-start the remediation <br /> p�uiuc. lticie ore, y .� �,'I....,h 14Q6, please submit a <br /> system and submit the system evaluation report. <br /> During a phone conversation in August 1995, we decided not to require free product removal <br /> and not to require that you address the contamination found in well N-15 until after the <br /> remediation system began operation because we thought the system would adequately address <br /> these problems. However, since the system has taken so long to get up and running, you are <br /> now required to bail free product from all monitoring wells which have a free product thickness <br /> greater than 0.1 foot every other week as required by monitoring and reporting program No. <br /> 94-806. The first free product bailing activities should take place by 8 March 1996. In <br /> addition, bailing event should have continued through August 1995, yet no reports of bailing <br /> have been provided since May 1994. All these records shall be included in the first quarter 1996 <br /> monitoring report which is due 30 April 1996. <br />
The URL can be used to link to this page
Your browser does not support the video tag.