My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> STATE OF CALIFORNIA-Environmental ProteqftAgency PETE WILSON, Governor <br /> C�tT Tr-0Ri,1% L <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A -- <br /> acramentc, CA 95827-3098 <br /> ONE: (916) 255-3000 „q <br /> (916) 255-3015 <br /> � 29 June 1994 <br /> Mr. Steve Ferrara <br /> Santa Fe Pacific Pipeline Partners, L.P. <br /> 888 South Figueroa Street <br /> Los Angeles. CA 90017 <br /> MONITORING AND REPORTING PROGRAM NO. 94-806, SANTA FE PACIFIC <br /> PIPELINE LEAK, HOLT, SAN JOAQUIN COUNTY <br /> Enclosed is Monitoring and Reporting Program (MRP) No. 94-806 for Santa Fe Pacific <br /> Pipeline's (SFPP) Holt site. As we discussed in our recent phone conversation, we have <br /> added surface water sampling to the MRP. You agreed to that and stated you had no <br /> other comments on the draft MRP. <br /> As we stated in our 8 March 1994 letter, since well construction details are unavailable <br /> for monitoring wells M-8, M-9, M-10, 0-1 and 0-2, these wells should not be included <br /> on ground water potentiometric contour maps (your first quarter ground water <br /> monitoring report did not reflect this). Also, the contour map in first quarter report <br /> should have been more complete. In accordance with the MRP, your next quarterly <br /> . monitoring report is due by 30 July 1994. <br /> We understand from recent phone conversations with you that you have not reached <br /> agreement with Mr. Coleman Foley or Lower Jones Company to gain access to those <br /> properties to conduct cleanup activities. This has been a problem for more than four <br /> years and has delayed cleanup during that time. These access issues must be resolved <br /> soon. We are willing to help the parties reach agreement through discussions with our <br /> legal staff. <br /> If you have any questions, please feel free to call me at (916) 255-3077. <br /> k -- <br /> �OEL M. WEISS <br /> Engineering Geologist <br /> Enclosure <br /> JMW:jmw/ldj <br /> cc: Mr. Phil Wyels, State Water Resources Control Board, Sacramento <br /> Mr. Mark C. Olson, Terra Services, Mission Viejo <br /> Mr. Mike Bombard, Levine-Fricke, Roseville <br /> San Joaquin County Public Health Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.