My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVIN&FRICKE <br /> ENGINEERS,HYDROGEOLOGISTS <br /> August 31, 1994 LF 3128 . 20 <br /> Mr. Michael Collins <br /> San Joaquin County Environmental Health Division <br /> 445 North San Joaquin Street <br /> Stockton, California 95201 <br /> Subject: Soil Gas and Ground-Water Monitoring Well Permit <br /> Application for SFPP Holt Site <br /> Dear Mr. Collins: <br /> Enclosed for your review and approval is a completed <br /> Application for Well/Pump Permit for the proposed soil gas <br /> investigation and installation of two ground-water monitoring <br /> wells at the Santa Fe Pacific Pipeline Partners, L. P. (SFPP) <br /> Holt site. Also attached for your review are (1) Work Plan <br /> for Further Soil and Ground-Water Investigation and <br /> Implementation of Interim Remedial Measures, dated March 15, <br /> 1994 , and (2) letter from Mr. Joel Weiss of the Regional Water <br /> Quality Control Board (RWQCB) to Mr. Steve Ferrara of SFPP, <br /> dated August 22 , 1994 . <br /> In accordance with our telephone conversation on August 31, <br /> 1994 , we will be submitting a check in the amount of $ 234 <br /> under separate cover, along with our completed billing and <br /> compliance forms which you are mailing to us. <br /> We have scheduled a soil-gas contractor to complete the <br /> proposed soil gas work on Monday September 12 , 1994 in order <br /> to comply with the RWQCB' s schedule. The proposed drilling <br /> activities for installation of the two ground-water monitoring <br /> wells will occur toward the end of September. <br /> We appreciate your assistance on this matter. Please give me <br /> or Tom Danaher (213-486-7739) of SFPP a call if you have any <br /> questions or comments. <br /> Sincerely, ,00�L E,,��',�� `�y�✓ _ �c� <br /> Gree"son W. � 4ylor, R.G. (�C.J�q ,, .—��f,p��r-- •�_TSi;��� <br /> Principal Hydrogeologist —J <br /> cc: Tom Danaher, SFPP <br /> Joel Weiss, RWQCB <br /> 3001 Douglas Boulevard,Suite 320 <br /> Roseville,California 95661 <br /> (916)786-0320 <br /> Fox(916)786-0366 <br /> Other offices in Emeryville,CA;Irvine,CA;Tallahassee,FL;Honolulu,HI <br />
The URL can be used to link to this page
Your browser does not support the video tag.