My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:14:59 AM
Creation date
6/18/2019 10:39:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct-08-01 04 : 15P • • P_ 13 <br /> comprehensively describe the physical characteristics of the site, the nature an <br /> d extent of <br /> contamination,and the fate and transport of contamination. This report would also provide <br /> a summary of previous investigations,and a regional description of the site setting and <br /> hydrogeology for context. This investigation report,together with the results of testing the <br /> interim remedial measures currently in place at the site (i.e., the groundwater and soil vapor <br /> extraction and treatment systems),will be used as a basis for performing a feasibility study <br /> to identify the preferred remedy for the site so that a remedial action plan can be developed <br /> for the site. <br /> 5.0 Schedule <br /> The schedule for implementing the SAC work is consistent with discussions held with the <br /> RWQCB at the August 15,2001,meeting. The schedule to perform the field work <br /> the results to the RWQCB is as follows,assumingRW p o k and report <br /> the April 13,2001,Work Plan by October 5,2001RWQCB approval of this addendum to <br /> • October 8,2001 -Finalize agreement with CPT/drilling contractor;mobilize to site <br /> • October 15 to 26,2001 -Perform field work(2 weeks) <br /> • November 15,2001-Verbally report preliminary results of investigation in quarterly <br /> meeting <br /> The results of the SAC will be presented to the RWQCB at the next quarterly meeting,which <br /> is scheduled for November 15,2001. Any additional necessary investigative work would be <br /> implemented in an expeditious manner under a schedule agreed to with the RWQCB at the <br /> meeting. Assuming that no additional investigative work is necessary, the comprehensive <br /> investigation report,as described above,would be submitted by January 31,2002. If <br /> additional field investigation is required,however, then the report would be delayed <br /> accordingly and submitted at a later date as agreed to with the RWQCB. <br /> 6.0 References <br /> LFR Levine-Fricke. Results of Deeper Groundwater <br /> Installation, SFPP,L.P. Holt Release Site,Holt,California. October 22 1999. for Well <br /> Deeper Groundwater Investigation and Well Installation Reportfor the SFPP, <br /> Holt Release Site near Holt, California. June 30,2000. L.P. <br /> Installation Report for Soil Vapor Extraction and Treatment System at the SFPP, L.P. <br /> Holt Release Site near Holt, California. June 30,2Q00. <br /> Work Plan for Source Area Characterization for the SFPP, L.P.Holt Release Site,Holt, <br /> California. April 13,2001. <br /> i <br /> 1 <br /> SCO/LAWM9.DOC1012430001 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.