My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COPPEROPOLIS
>
10848
>
2900 - Site Mitigation Program
>
PR0536777
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:38:10 AM
Creation date
6/18/2019 11:11:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536777
PE
2960
FACILITY_ID
FA0021126
FACILITY_NAME
FORMER COUNTRYSIDE MARKET
STREET_NUMBER
10848
STREET_NAME
COPPEROPOLIS
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10311006
CURRENT_STATUS
01
SITE_LOCATION
10848 COPPEROPOLIS RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Countryside Market,Stockton,California <br /> Feasibility Study and Interim Remedial Action Plan May 20,2013 <br /> 10.0 ESTIMATED PROJECT SCHEDULE <br /> An estimated project schedule from feasibility testing through Site closure/ st-remediation monitoring is <br /> provided below. This tentative schedule presents project events and mi stones including significant <br /> reports and remedial actions. We understand this schedule is dependent upon EAR account funding and <br /> State Board approval, and will continually evolve as Site activities progress/ onditions improve. <br /> Task Estimated Estimated <br /> Start Date Completion Date <br /> Domestic Well Video Logging 7/15/13 7/31/13 <br /> Cone Penetration Testing 7/31/13 8/15/13 <br /> EAR Fund Approval 6/1/13 9/1/13 <br /> Feasibility Testing 9/1/13 11/1/13 <br /> Feasibility Test Reporting 11/1/13 1/1/14 <br /> Regulatory Review/Approval 1/1/14 3/1/14 <br /> Sparge System Permitting 3/1/14 6/1/14 <br /> Equipment and Contractor Procurement/Coordination 3/1/14 6/1/14 <br /> Field Implementation/Agency Inspections 6/1/14 8/1/14 <br /> Sparge System Shakedown/Start-Up Testing 8/1/14 8/15/14 <br /> Sparge System Routine O&M (Weekly/Monthly) 8/15/14 8/15/17 <br /> Treatment System Installation and Quarter 3, 2014 10/1/14 10/31/14 <br /> Groundwater Monitoring and Sampling Report <br /> ——: <br /> Routine Sparge System O&M and Groundwater 1/1/15 10/31/17 <br /> Monitoring/Reporting (Quarterly) <br /> Monitored Natural Attenuation 10/31/17 11/30/18 <br /> Request for Site Closure 11/30/18 12/31/18 <br /> FeasiGlity Sand Feavibft Swdy&IW Tw Fiml.dw 10-1 The Source Group,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.