Draft Final Site-Wide ROD - 2 - • 17 June 2008 1 <br /> Lawrence Livermore Natio Laboratory Site 300 <br /> U.S. Department of Energy <br /> San Joaquin County <br /> 3. Page 2-38, Section 2.9.2. Remedial Alternatives for Building 834 (OU-2). DOE states <br /> that it will continue evaluating innovative technologies to improve remediation of VOCs in <br /> low-permeability sediments to expedite cleanup. DOE has been conducting a <br /> bioremediation pilot study which should be mentioned in the Final SWROD. DOE needs <br /> to commit to a schedule for completing the bioremediation study and presenting the results <br /> to the regulatory agencies. <br /> 4. Page 2-83, Pit 7 Complex (OU 5). In this section, DOE states "There is minimal short- <br /> term exposure risk to workers that can be controlled." This statement is with reference to <br /> the drainage diversion system that has been completed. Please explain what the minimal <br /> risk to workers is and how it will be controlled or remove the sentence. <br /> 5. Page 3-8, Section 3.2.3.1. Hydraulic Control of the Tritium Plumes. DOE states that <br /> the Qal/WBR HSU is not saturated for significant periods during the year; therefore, <br /> significant downgradient plume migration does not occur. The Building 850 plume in the <br /> Qal/WBR HSU has migrated down Doall Ravine, a distance of more than 3,000 feet. DOE <br /> needs to state the distance the plume has migrated and explain why the distance of at <br /> least 3,000 feet does not represent significant migration. <br /> 6. Pages 2-46 and 2-47, Remedial Alternatives for Building 832 Canyon. DOE proposes <br /> monitored natural attenuation (MNA) for nitrate in the Building 832 Canyon OU; therefore <br /> the heading for section 2.9.8.2 should include MNA. On page 2-47, DOE states that <br /> nitrate-bearing treated effluent is either discharged via misting towers or is injected into <br /> Tnbs2 to undergo natural denitrification. The three groundwater treatment systems all <br /> discharge treated nitrate-bearing effluent via misting towers. DOE needs to show the <br /> locations of the misting towers on the appropriate figures and add a sentence in the text <br /> stating that, although MNA for nitrate was selected for nitrate remediation, no injection of <br /> treated effluent is occurring at present. DOE should explain why the effluent is not being <br /> re-injected into the Tnbs2 HSU and if DOE plans to do so in the future. <br /> 7. Figures 2.4-2 and 2.5-7. Figure 2.5-7, Building 850 Firing Table (OU 5) contaminants in <br /> ground water above cleanup standards, shows a separate perchlorate plume above the <br /> MCL which is detected by monitoring well NC2-18 and is not shown on Figure 2.4-2 (Map <br /> of Site 300 showing operable units with ground water plume outlines and water-supply <br /> Pp Y <br /> wells). Figure 2.5-7 does not show perchlorate in groundwater detected in monitoring wells <br /> NC7-29 and W-Pit7-2141 south and north of the Building 850 plume, as is shown on <br /> Figure g 2.5-11 of the 2007 Annual Compliance Monitoring Report. On Figure 2.5-7, DOE <br /> needs to show the extent of perchlorate above cleanup standards in groundwater in the <br /> Building 850 area. In DOE's response to my draft SWROD comment number 6, DOE <br /> states that Figure 2.4-2 shows COCs above background; therefore, on Figure 2.4-2, please <br /> show the contours for all detectable perchlorate in groundwater in the Pit 7 <br /> Complex/Building 850 OU and in the text identify the source(s) of the occurrences of <br /> perchlorate that are disconnected from the sources at the Pit 7 Complex and Building 850. <br />