Laserfiche WebLink
CLOSURE REPORT FOR UNDERGROUND STORAGE TANK 871-DiU1 <br /> Name and address of disposal facility: Erickson Inc (Hauler Registration No 0019) <br /> 255 Parr Blvd. Richmond CA 94801 510 23 -1393. <br /> [X ] Uniform Hazardous Waste Manifest"TSD Facility to Generator" and LLNL Hazardous <br /> Waste Disposal Requisition copies for UST 871-D1U1 are enclosed as Appendix C. <br /> [N/A] UST Disposition Tracking Record enclosed (San Joaquin County Only). <br /> SIC Tank# 39-1945-17 <br /> EXCAVATION INFORMATION: <br /> Soil was excavated by: Aronson Engineering Date: 7/26/94 <br /> Shoring was required: [ ] Yes [ X] No <br /> Type of shoring used: N A. <br /> Soil types encountered within the tank excavation: <br /> 0-3 in. Asphalt. <br /> 3 in. - 1 ft. Soil and gravel base. <br /> I -20 ft. Grey siltstone and grey sandy soil <br /> Describe any potential contaminant pathways such as tree roots or underground utility lines <br /> discovered in the excavation: Fractures in the siltstone were noted. <br /> Describe anv odors or staining found in the fill material or native soil: 1.) At the beginning of <br /> excavation around the tank four 55 gallon drums were filled with diesel fuel contaminated <br /> pea gravel removed from around the fill pipe The drums were given to LLNL Hazardous <br /> Waste Management for disposal. 2 ) The native siltstone below the tank and fill gravel <br /> contained diesel fuel believed to have been released from a tank that was replaced in 1982 <br /> by the iust removed tank. <br /> Soil Disposal Information: <br /> [ ] Not Applicable. (Soil and backfill placed back into the tank excavation and piping trench). <br /> The volume of disposed soil: 85 cubic yards. <br /> The soil was transported by: Aronson Engineering created piles pending completion <br /> of analyses of soil samples and review of results <br /> The soil was disposed of as: N/A Date: N/A <br /> The concrete tank anchoring structure(s) was disposed of with the soil: <br /> [NA] Yes [ ] No [ ] Left in the Tank Excavation [ ] N/A <br /> If no,describe how the concrete tank anchoring structure(s) was disposed of: N/A <br /> Name and address of disposal facility: Not vet determined Results of analyses of soil samples <br /> are being reviewed. <br /> Additional native soil removed as part of a remedial effort: [ X ] Yes [ ) No <br /> Diesel fuel contaminated soil(siltstone) was excavated to a depth of 20 feet <br /> [ ] LLNL Hazardous Waste Requisition and Uniform Hazardous Waste Manifest"TSD <br /> Facility to Generator"copy for the soil enclosed. Will be submitted when available <br /> Volume of native soil removed: 55 cubic yards. <br /> Volume of backfill removed: 30 cubic yards. <br /> Describe how the excavated soil was handled (i.e. how and where it was stored): The soil was <br /> stockpiled on visqueen covered with visclueen and stored The soil will be retained at thi <br /> site until soil analyses and review procedures are complete Shipping documents and/or <br /> hazardous waste manifests will be forwarded to the Countywhen soil disposal is com Tete. <br /> Soil or backfill returned to the tank excavation or piping trench: [ ] Yes [ X] No <br /> If yes,volume of soil returned to the excavation: N/A cubic yards <br /> Reason for the return of the soil to the tank excavation or piping trench: N/A. <br /> 2 <br />