Laserfiche WebLink
• • <br /> PHOTOGRAPH 5: From left to right,834-DlU1 closure site: The pile of excavated <br /> materials,the excavated tank,the clean soil to be used as fill,the lift, <br /> groundwater monitoring well W-834-D8,and the excavation.............................D-7 <br /> PHOTOGRAPH 6: Patti Kluck collecting a soil sample from the pile of materials <br /> excavated at the 834-D1U1 closure site....................................................................D-8 <br /> APPENDIX E: ANALYTICAL DATA&CHAIN OF CUSTODY RECORDS...............................E-1 <br /> APPENDIX F: FIELD DENSITY(SOIL COMPACTION)REPORT...............................................F-1 <br /> APPENDIX G: COPY OF THE UNDERGROUND STORAGE TANK UNAUTHORIZED <br /> RELEASE (LEAK)/CONTAMINATION SITE REPORT,TANK <br /> 834-DlU1 AT BUILDING 834................................................................................ ...G-1 <br /> APPENDIX H: FINAL FEASIBILITY STUDY FOR THE BUILDING 834 OPERABLE <br /> UNIT,LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300, <br /> UCRL-AR-113863,JULY 1994 <br /> (Ring Binder Provided Under Separate Cover)....................................................H-1 <br /> APPENDIX I: SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES LETTER TO LLNL <br /> "LLNL-SITE 300,UST REMOVALS-BLDGS#834 AND 871",AUGUST 4, <br /> 1994..................................................................................................................................I-1 <br /> APPENDIX J: LLNL LETTER TO SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br /> "SOIL VAPOR MONITOR INSTALLATION AT THE BUILDING 834 COMPLEX, <br /> LLNL SITE 300",AUGUST 3, 1994..............................................................................J-1 <br />