My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
1785
>
2900 - Site Mitigation Program
>
PR0517366
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 5:09:39 PM
Creation date
6/18/2019 4:38:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517366
PE
2950
FACILITY_ID
FA0013377
FACILITY_NAME
FITZPATRICK HOMES
STREET_NUMBER
1785
Direction
N
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
949412933
CURRENT_STATUS
01
SITE_LOCATION
1785 N CORRAL HOLLOW RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - KLEi NEELDER <br /> For the protection of the drilling crew, the organic vapor detector also is used to measure the <br /> volatile concentrations in the breathing zone prior to and while drilling the borings. Total <br /> ionizable hydrocarbon readings in excess of 1 ppmv may necessitate respiratory protection for <br /> the affected crew members. This requirement is included in the complete field health and safety <br /> plan developed for the project prior to the start of field work. <br /> B-2.4 Collection of Soil Samples <br /> Soil samples are collected approximately every 5 to 10 feet for field screening and logging. <br /> Samples are collected by advancing the boring to a point immediately above the desired sampling <br /> depth and then driving (vertical borings) or pushing (slant borings) a 2-inch diameter Modified <br /> California Split-Spoon Sampler, lined with three 6-inch long brass tubes, into the undisturbed <br /> soil. The sampler is then removed from the bottom of the boring. The ends of the bottom (third) <br /> tube are covered with Teflon and sealed with tight fitting plastic caps. <br /> Each sample is individually labeled. The label includes Kleinfelder's name,job number, the date <br /> and time the sample was collected, the employee number of the individual who performed the <br /> sampling, and a unique five-digit sample identification number. <br /> B-2.5 Hydropunch 11' Groundwater Sampling <br /> Hydropunch H" is a method to collect representative groundwater samples from boreholes <br /> without the need to install monitoring wells. This method is usually used as an exploration tool <br /> for screening groundwater quality and reducing the number of wells needed at a site. <br /> A boring is drilled to the desired sampling depth, usually to the top of the groundwater surface, <br /> using hollow stem augers. The Hydropunch II' system, consisting of a steel drive point attached <br /> to a stainless steel barrel with an internal PVC slotted screen, is driven 2 to 3 feet past the bottom <br /> of the boring into the uppermost water bearing zone. The barrel is connected to the surface using <br /> clean, 2-inch diameter hollow steel rods. The barrel is then pulled back 1 to 2 feet exposing the <br /> internal PVC screen to the soil. Groundwater then enters the barrel through the screen under <br /> hydrostatic pressure and is brought to the surface with a clean, Teflon or stainless steel bailer. <br /> The samples are immediately labeled and placed in an iced sample container. <br /> Equipment used for Hydropunch Il' sampling is decontaminated prior to use at each sampling <br /> location by steam cleaning, or by scrubbing in a trisodium phosphate or non-phosphate detergent <br /> wash followed by a distilled water rinse. <br /> 20-YP1-628/2011P180 Page B-2 <br /> 112001,Kleinfelder,Inc. July 2,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.