My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011652
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
0
>
2900 - Site Mitigation Program
>
PR0521409
>
ARCHIVED REPORTS XR0011652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 1:22:37 PM
Creation date
6/20/2019 11:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011652
RECORD_ID
PR0521409
PE
2950
FACILITY_ID
FA0014531
FACILITY_NAME
PLYMOUTH ROAD STORM DRAIN PROJECT
STREET_NUMBER
0
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
0 COUNTRY CLUB BLVD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' k`q KLEINFELDER <br /> A-2 7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring In addition, sampling equipment is cleaned with a <br /> ' tnsodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample <br /> i <br /> A-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil bonngs are closed immediately after the collection and logging of soil samples Closure is <br /> accomplished by grouting the boring with a cement/bentonite slurry or as otherwise required <br /> Dnll cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner If requested, Kleinfelder can coordinate disposal <br /> of soil and water after analytical results are available <br /> M <br /> ' A-3 GROUNDWATER WELL INSTALLATION <br /> A-3 1 MonitorinLy Well Construction <br /> ' Construction details for shallow groundwater monitoring wells are as follows <br /> ' • The well casing are 2- or 4-inch inside diameter, flush threaded point, schedule 40 PVC <br /> pipe <br /> • The wells are constructed in 8- or 10-inch diameter borings <br /> ' Well screen sections are perforated with 0 010- or 0 020-inch factory-cut slots <br /> I <br /> ' 28699 E01 /ST03R627 Pae A-4 <br /> Copyn,hl 2003,Klemfelder,Inc April 22,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.