Laserfiche WebLink
;�� K L E I N F E L D E R <br /> • reduce moisture loss and disturbance and brought to our Stockton laboratory foi further <br /> testing <br /> A key to the Logs of Borings is presented on Plate A-2 of the appendix The Logs of Borings <br /> are presented on Plates A-3 to A-8 of the appendix Please note the bonnQs were located in the <br /> field by visual sighting and/or pacing from existing site features Therefore, the locations of <br /> borings shown on Plate 1 should be considered lughly approximate and may vary from that <br /> indicated on the plate <br /> 32 Laboratory Investigation <br /> Laboratory tests were performed in accordance with current ASTM standards on selected soil <br /> samples to evaluate their physical characteristics and engineenng properties The laboratory <br /> testing program was formulated with emphasis on the evaluation of natural moisture content, <br /> in-place density, grain-size distribution, plasticity, and undrained shear strength of the materials <br /> encountered One resistance value (R-value) test was performed on a composite sample of the <br /> subgrade soils to evaluate preliminary pavement sections In addition, pH, minimum <br /> resistivity, sulfate, and chloride tests were performed to evaluate the corrosivity of the soils to <br /> buried concrete and ferrous metals <br /> The results of laboratory tests are summarized on Plate A-9 in the appendix This information, <br /> along with the field observations, was used to prepare the final test boring logs <br /> 4 SITE CONDITIONS <br /> 41 Surface <br /> The alignment of the proposed sewer trunk lies in a mostly residential area located east of the <br /> San Joaquin River/Stockton Deep Water Channel and north of Smith Canal Interstate 5 is in <br /> the western portion of the study area, and Pershing Avenue is on the eastern side of the project <br /> area <br /> Boring B-1 was dnIled in a relatively level vacant Iot west of I-5 scattered weeds covered the <br /> ground surface Borings B-2 through B-& were drilled out of traffic in pavement areas along <br /> Country Club Boulevard Plymouth and Mission Roads, and Middlefield Avenue Borings B-2 <br /> 13-3 and B-b were located in City of Stockton right-of-wavy and Borings B-4 and B-5 were in <br /> San Joaquin County right-of-way <br /> 42 Subsurface <br /> The subsurface conditions encountered were relatively consistent with our previous omoerience <br /> in the project area These soils consisted predominately of moderately plastic stiff to hard <br /> sandy and silty cla-v to depths ranging from about to 10 feet below the existing site °rade <br /> 1"629 G01/2002R369 aprii 19 '002 <br /> �5 2002 Klemtelder Inc Paee' of 16 <br />