Laserfiche WebLink
CA �IIBRIA <br /> i <br /> ANTICIPATED THIRD QUARTER 2003 ACTIVITIES <br /> Blaine will coordinate quarterly sampling events with the Tosco station, gauge and sample the <br /> site wells according to the existing sampling schedule, and tabulate the data. Cambria will <br /> prepare a groundwater monitoring report. <br /> Cambria is scheduled to drill the cone penetration test borings proposed in our <br /> November 12, 2002 Response Letter/Site Conceptual Model/Site Investigation Work Plan <br /> August 4 through $, 2003. <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336. <br /> Sincerely, <br /> Cambria Environmental Technology, Enc. <br /> s <br /> Anne Wettstone <br /> Staff Geologist <br /> GFO� <br /> C9 �QH W. O <br /> Joe W. Neely, RG <br /> Senior Project Geologist -� <br /> RG 6927 0No-6927 0 <br /> CALL <br /> 0943 2 <br />