Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: 9f Date: )- a,�.193 <br /> Alisto Project No: )0-03-7 Field Personnel: L <br /> Service Station/No: f 119 a- Address:_ S54-OL401, <br /> Well ID: tW r-5Field Activity: Well Development XWell Sampling _Product Bailing <br /> Casing Diameter: Purge Method: Well Data: <br /> __2 Inch (0.16 Gal/foot) Pump (dispos. Poly Tubing) X� Depth to Product <br /> _3 Inch (0.37 Gal/foot) 1Disposable Bailers 3EProduct Thickness <br /> _X-4 Inch (0.65 Gal/Foot) _Other .17.'nDepth to Water <br /> _4.5 Inch (0.83 Gal/foot) ^1.66 PVC Standard Bailer <br /> _6 Inch (1.47 Gal/foot) 3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> Ybisposable Bailer Triple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Pure Volume <br /> ft X LGal/Ft = j p Sa Gal X -3 �. <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Development/Samipling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis Container Presery <br /> OF (ttmhos/ Vol Turbidity Required Type <br /> cm))(10oo (C-1) <br /> 1J . TPH- VOA HCL <br /> G/BTEX <br /> �3 � � �� �� TPH- Amber Solvent <br /> f <br /> f Diesel Liter Rinsed <br /> 3 y3,S EPA 601 VOA <br /> l, "S15-5 <br /> TOG Amber H,SO� <br /> 1347 `"�� J � �� 552OBF Liter <br /> -9� 9_�_ 105, Ji I 1- <br /> iz ;,e 13 0 JJ Woo <br /> i SSoI� o � <br /> FORM:FS3J121592 L4 <br />