Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: ge _ Date: 1112-1113 <br /> Alisto Project No: 10—037 Field Personn 1: <br /> Service Station No: 1119;1- Address: <br /> Well ID:MW _4ield Activity: _Well Development /► Well Sampling —Product Bailing <br /> Casing Diameter: Purge Method: Well Data: <br /> ____2 Inch (0.16 Gal/foot) i'kPump (dispos. Poly Tubing) Depth to Product <br /> _3 Inch (0.37 Gal/foot) XDisposable Bailers Product Thickness <br /> _X4 Inch (0.65 Gal/Foot) __Other o172Depth to Water <br /> _4.5 Inch (0.83 Gal/foot) _1.66 PVC Standard Bailer <br /> _6 Inch (1.47 Gal/foot) 3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> XDisposable Barer Triple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Purge Volume r �7 _ �3 01 <br /> � a =I�ft X �5 GallFt = �• Lo f Gal X3 <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Development/Sampling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis Container Presery <br /> OF (umbos/ Vol Turbidity Required Type <br /> c7n)X10Op (Gal) <br /> � TPH- VOA HCI. <br /> lq;sd G 1.1 -7S9 .� G/BTEX <br /> TPH- Amber Solvent <br /> t J 3o �9 ] 7.57 3 Diesel Liter Rinsed <br /> r <br /> m,5 69.1799 . 3 C) I EPA 601 VOA <br /> ) 4 4 Q 1 •� TOG Amber H.SOi <br /> 5520SF Liter <br /> iy o ? y�S I SS <br /> FORM:FS31121592 <br />