Laserfiche WebLink
placed in MW7A and water will be pumped from the well at the pumps maximum <br /> liecapacity . <br /> Down hole pressure transducers will be used to collect drawdown information from <br /> MW7A, MW7B, and MW 3 <br /> If particular interest in this test will be the timing of the arrival of observable drawdown <br /> in MW7B, which will be indicative of the leakage between the two sands. <br /> TEST SCHEDULE <br /> 1. Week prior to start test. Place pressure transducers in MW6A and MW6B. <br /> 2. Day one, Step drawdown test RWiA Test to last 8 to 10 hours formation allowed to <br /> recover over night. <br /> 3. Day two, step drawdown test MW1. Test to last 8 to 10 hours fornratron allowed to <br /> recover overnight. <br /> 4. Day three, constant rate test MW6A Test last to day four, formation allowed to <br /> recovery one day <br /> 5. Day Five, constant rate test MW6B. Test last to day six, formation allowed to <br /> recovery one day. <br /> 6 Day eight, leakage test MW7A <br /> 4 <br /> i <br /> fi <br /> 29 Sanchez 2nd QM 2001 <br />