Laserfiche WebLink
I <br /> i pump in RW1A The water will be pumped through carbon to the sanitary sewer under vanance <br /> from the Stockton sewer district This test will be carred out for a period of eight hours Dunng <br /> the test, the pump rate will be increased an steps, starting at one gallon per minute As the <br /> drawdown in the well reaches equilibrium, the pump rate will be increased an one gallon per minute <br /> increments <br /> Down hole pressure transducers will be used to collect drawdown information from MW6A, <br /> N4W6B, RW 1 A, and RW 1B The top of water will be sounded an the other wells periodically with <br /> the depth to water meter and the fame and measurement will be recorded The results of the test will <br /> be evaluated by developing both distance drawdown and drawdown over time graphs for the wells <br /> STEP DRAWDOWN TEST RWO1E <br /> In order to get some idea of the practicality of de-watering the B-Zone a Step Drawdown test will <br /> be performed in RW1B The test will be performed by placing a vanable speed Grundfos pump in <br /> RW1B The water will be pumped through carbon to the sanitary sewer under variance from the <br /> Stockton sewer district This test will be carried out for a penod of eight hours During the test, the <br /> pump rate will be increased in steps, starting at one gallon per minute As the drawdown in the well <br /> reaches equnlabnum,the pump rate will be increased in one gallon per minute increments <br /> Down hole pressure transducers will be used to collect drawdown information from MW6A, <br /> MW6B, RW 1 A, and RW 1 B Depth to water an the other surrounding wells wall be measured <br /> periodically with the depth to water meter and recorded The results of the test will be evaluated by <br /> developing both distance drawdown and drawdown over time graphs for the wells <br /> 24 HOUR CONSTANT RATE PUMP TEST MW6A <br /> In order to determine the aquifer properties of the upper sand (A Zone) a constant rate pump test <br /> will be performed from MW6A The pump will be placed in MW6A and water will be pumped <br /> from the well at a rate that will not convert the well from confined to unconfined conditions <br /> Down hole pressure transducers will be used to collect drawdown information from MW6A, <br /> MW6B, RW 1 A, and RW 1 B Depth to water an the other surrounding wells will be measured <br /> periodically with the depth to water meter and recorded The results of the test will be evaluated by <br /> developing both distance drawdown and drawdown over time graphs for the wells <br /> Of particular interest in thus test will be the timing of the observable drawdown to MW6B, which <br /> will be indicative of the leakage between the two sands <br /> 24 HOUR CONSTANT RATE PUMP TEST MW6B <br /> • In order to determine the aquifer properties of the B-Zone sand a constant rate pump test will be <br /> performed from MW6B The pump will be placed in MW6B and water will be pumped from the <br /> well at five gallons per minute <br /> 3 <br /> Rev Pump Test Plan-Appendix A, 1110102 <br />