My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006103
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 12:38:45 PM
Creation date
6/21/2019 10:30:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006103
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wDown-hole pressure transducers will be used to collect drawdown information from MW6A, <br /> MW6B, RW 1 A, and RW 1 B Depth to water in the other surrounding wells will be measured <br /> periodically with the depth to water meter and recorded The results of the test will be evaluated by <br /> developing both distance drawdown and drawdown over time graphs for the wells <br /> Of particular interest in this test will be the timing of the observable drawdown in MW6A which <br /> will be indicative of the leakage between the two sands <br /> TEST TO DETERMINE TIGHTNESS OF SEALS MW7A, MW7B <br /> In order to determine if there is communication between the two groundwater zones due to the <br /> presence of MW713, a short test will be performed in MW7A The pump will be placed in MW7A <br /> and water will be pumped from the well at the pump's maximum capacity <br /> Down hole pressure transducers will be used to collect drawdown information from MW7A, <br /> andMW7B <br /> Of particular interest in this test will be the timing of the arrival of observable drawdown in MW7B <br /> which will be indicative of the leakage between the two sands <br /> TEST SCHEDULE <br /> 1 Week prior to start test Place pressure transducers in MW6A and MW613 <br /> 2 Day one, Step drawdown test RW 1 A Test will last 8 to 10 hours Formation allowed to recover <br /> over night <br /> 3 Day two, step drawdown test RW 1B Test will last 8 to 10 hours, Formation allowed to recover <br /> overnight <br /> 4 Day three, constant rate test MW6A Test will last into day four (24 hours) Formation allowed <br /> to recover for one day <br /> 5 Day Five, constant rate test MW613 Test will last into day six (24 hours) Formation allowed to <br /> recover for one day <br /> 6 Day eight, leakage test MW7A <br /> 4 <br /> Rev Pump Test Plan- Appendix A, 1110102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.