My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006129
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:21:32 PM
Creation date
6/21/2019 10:48:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006129
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to a viton vacuum diaphragm pump and the tubing:; is evacuated of all the ambient air that <br /> may have entered the line Then it begins to purge the soil gas and or vapors that are <br /> present it this depth Upon monitoring the pumping rate of the vacuum pump and <br /> measuring the air temperature with a in-line digital thermometer, a calibrated Thermodyne <br /> 580B Photo Ionization Detector is connected to the auxiliary output }port of the pump and <br /> the readings encountered are logged. <br /> E) Capon completing the measurements of the soil gas at the prescribed depth, the <br /> surface equipment is disconnected and the soil gas probe with it's cxtcnsions ate <br /> i em oved <br /> F) The next task is decontamination of all the extension rods and the soil gas vapor <br /> probe This i_s completed by washing the rods and probe with a al(.onox nun-phosphoric <br /> detergent and then steam cleaning all the pieces Between each sampling point new teflon <br /> tubing is used and the old tubing is discarded appropnately <br /> G) The soil gas vapor hole that remains after the tads have been removed is then filled with <br /> a wet neat cement slurry through a tunnel The cement is agitated with a long steel rod <br /> to assist the material down the entire length of the hole <br /> H) At this point, we arc ready to begin our next vapor point and take another measurement <br /> laid operating procedure followed when we ate ..om <br /> The fallowing is the stars p l3 leting these type p p <br /> of tasks It you have any additional questions , please call my office and 1 will assist <br /> Sincerely, <br /> Donald E Light <br /> TOTAL P 03 <br /> - --------------- ----------- -------- -- -- - - ---- ----- ---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.