My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2081
>
3500 - Local Oversight Program
>
PR0544590
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:50:58 PM
Creation date
6/21/2019 10:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544590
PE
3528
FACILITY_ID
FA0003932
FACILITY_NAME
KWIKEE FOODS
STREET_NUMBER
2081
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12315225
CURRENT_STATUS
02
SITE_LOCATION
2081 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.17. REQUIREMENTS FC" 'DESTROYING MONITORING WEL' , AND EXPLORATION HOLES <br /> 13.17.1. A monitor ng well shall be investigated to deternbne its condition and details or its <br /> construction prior to its destruction. <br /> 13.17.2. The well shall be sounded immediately before it is destroyed to determine whether <br /> there are obstructions that will interfere with filling and sealing. <br /> 13.17.3. Any obstructions found in the well or boring shall be removed before filling and <br /> sealing operations begin. <br /> 13.17.4. If the well was constructed and maintained in accordance with these Standards, the <br /> sealing material shall be placed under pressure to ensure that the monitoring well is <br /> properly filled and sealed. <br /> 13.17.5. Casing material may require perforation, or puncturing, to allow for proper <br /> placement of sealing materials. <br /> 13.17.6. If the well construction is unknown and/or is located in an area of known or <br /> suspected pollution or contamination, the well shall be destroyed by removing all <br /> p _material within.the original borehole (including-the well using, screen, filter pack, <br /> and annular seal); and the created hole filled completely with appropriate sealing <br /> material. <br /> 13.17.7. Exploratory borings, installed for sampling purposes, shall be completely grouted <br /> with appropriate sealing material. The top 3 feet of the boring may be backrlled <br /> with clean, uncontaminated fill material. <br /> 13.17.8. The well or exploratory boring shall be filled by use of a tremie pipe or equivalent, <br /> proceeding upward from the bottom of the well or boring. Any deviation from this <br /> method must be approved by the Director. <br /> 13.17.9. Sealing materials shall be Placed in one confmious operation unless conditions in the <br /> well or boring dictate that sealing operations be conducted in a staged manner and <br /> prior approval is obtained from the Director. <br /> 13.17.10. Pressure required for the placement of sealing material shall be maintained long <br /> enough for sealing materials to Properly set- <br /> 13.17-11. verification shall be made to determine that an adequate seal has been installed by <br /> a EED representative. <br /> 13.17.12. If the well casing was left in place during sealing operations, a hole at least one foot <br /> larger m diameter than the originally drilled hole shall be excavated around the <br /> outside of the well casing to a depth of 3 feet below the,ground surface, and the well <br /> . _QiiUL shall then be cut off 6 inches above the bottom of this excavation and <br /> removed. <br /> ell shall be allowed to spill over into the excavation, <br /> 17.13. The grout used to fill the w <br /> during the sealing operation, and fill it for a thickness of one foot and formacap" <br /> which has a diameter of at least one foot greater than the diameter of the originally <br /> drilled hole. <br /> the sealing material has set, the excavation shall be <br /> 13.17.14. After the sealing operation and <br /> filled with clean soil. <br /> this section must obtain prior approval from the Director. <br /> 13.17.15. Any deviation from <br />
The URL can be used to link to this page
Your browser does not support the video tag.